|
API: 15-009-24645
Operator: PELICAN HILL OIL & GAS, INC. Field: Leoville Lease: CHURCH Well 1 |
Location: T17S R15W, Sec. 1, SW NE SE NW
3591 North, 3284 West, from SE corner Longitude: -98.9337086 Latitude: 38.6042071 County: Barton Status: OIL-P&A |
Spud Date: 11/17/1997
Completion Date: 11/24/1997 Plugging Date: 09/24/2008 Total Depth: 3474 Form. at depth: ARBUCKLE GROUP Elevation: 1976 KB |
| e-logs mis-marked 100' E of N2 SE NW - EB 3-5-2002 | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3444 to 3472
Formation tested: Arbuckle | Date, Time: 11/24/1997; 06:25:08 |
|
Initial Hydro Pressure: 1666 PSI
First Initial Flow Pressure: 10 PSI First Final Flow Pressure: 63 PSI Initial Shut-in Pressure: 951 PSI Second Initial Flow Pressure: 68 PSI Second Final Flow Pressure: 110 PSI Final Shut-in Pressure: 945 PSI Final Hydro Pressure: 1713 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3430 ft. |
|
Initial Flow- 1 1/2"" blow building to bottom of bucket in 11 minutes Initial Shutin- surface blow building to 1 1/2"" Final Flow- 1"" blow building to bottom of bucket in 16 minutes Final Shutin- |
|
|
Bottom Hole Temperature: 98 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 280 of Total Fluid 280 of Fluid in Drill Pipe 200 of gas in pipe 190 of clean gassy oil 10% gas 90% oil 90 of heavy oil cut mud 30% oil 70% mud 34 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |