Drill Stem Tests Database
Specific Well--15-009-24646
API: 15-009-24646
Operator: Maxwell Operating, Inc.
Field: Beaver
Lease: Staudinger
Well 1
Location: T16S R12W, Sec. 9, SW NE NE
4290 North, 990 West, from SE corner
Longitude: -98.6488561
Latitude: 38.6786287
County: Barton
Status: OIL-P&A
Spud Date: 12-DEC-97
Completion Date: 17-DEC-97
Plugging Date: 17-DEC-97
Total Depth: 3346
Form. at depth: ARBUCKLE GROUP
Elevation: 1873 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3052 to 3090
Formation tested: K.C.
Date, Time: 15-DEC-97; 23:11:22
Initial Hydro Pressure: 1505 PSI
First Initial Flow Pressure: 52 PSI
First Final Flow Pressure: 52 PSI
Initial Shut-in Pressure: 59 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 43 PSI
Final Shut-in Pressure: 46 PSI
Final Hydro Pressure: 1501 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3022 ft.
Initial Flow: Weak Blow Thoughout 1/2"" Blow. Initial Shutin: No Blow.
Final Flow: Weak surface blow died in 15 minutes.
Final Shutin: No blow.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Slightly oil cut mud 4%oil 96%mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3088 to 3143
Formation tested: K.C.
Date, Time: 16-DEC-97; 12:53:39
Initial Hydro Pressure: 1567 PSI
First Initial Flow Pressure: 109 PSI
First Final Flow Pressure: 123 PSI
Initial Shut-in Pressure: 715 PSI
Second Initial Flow Pressure: 152 PSI
Second Final Flow Pressure: 156 PSI
Final Shut-in Pressure: 611 PSI
Final Hydro Pressure: 1515 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3038 ft.
Initial Flow: Weak building to good blow 1/2"" to 6 1/2"".
Final Flow: Weak blow throughout. 1\4"" to 3""blow.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
237 of Total Fluid
30 of Fluid in Drill Collars
207 of Fluid in Drill Pipe
60 of Gas in pipe.
1 of Clean oil 100%oil.
112 of Muddy water 55%water 45% mud
124 of Muddy water 75%water 25% mud
36000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.