Drill Stem Tests Database
Specific Well--15-009-24647
API: 15-009-24647
Operator: Maxwell Operating Co., Inc.
Field: Beaver
Lease: Cox
Well 1
Location: T16S R12W, Sec. 10, NW NE SE
2310 North, 990 West, from SE corner
Longitude: -98.6302417
Latitude: 38.6730954
County: Barton
Status: OIL
Spud Date: 03-DEC-97
Completion Date: 11-DEC-97
Plugging Date:
Total Depth: 3364
Form. at depth: ARBUCKLE GROUP
Elevation: 1915 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 2914 to 2945
Formation tested: Topeka
Date, Time: 07-DEC-97; 20:56:29
Initial Hydro Pressure: 1399 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 754 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 40 PSI
Final Shut-in Pressure: 710 PSI
Final Hydro Pressure: 1396 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.2 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 2884 ft.
Initial Flow: Weak building to a good blow 1"" to 7"" blow
Final Flow: Weak building to a good blow 1"" to 7"" blow
Bottom Hole Temperature: 96 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
62 of Total Fluid
30 of Fluid in Drill Collars
32 of Fluid in Drill Pipe
62 of Heavy oil & gas cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3081 to 3116
Formation tested: K.C.
Date, Time: 08-DEC-97; 16:13:17
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3055 ft.
IFP-Strong Blow gas to surface in 9min. FFP-Strong Blow ""
Bottom Hole Temperature: 104 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
278 of Total Fluid
30 of Fluid in Drill Collars
248 of Fluid in Drill Pipe
30 of Heavy Oil&Gas Cut Mud
62 of Heavy Oil&Gas Cut Watery Mud
62 of Sli.Oil&Gas Cut Water
124 of Water
81000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3140 to 3160
Formation tested: K.C.
Date, Time: 09-DEC-97; 06:42:30
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.2 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3110 ft.
IFP-Strong Blow Thoughout FFP-Strong Blow in 1 min.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1786 of Total Fluid
30 of Fluid in Drill Collars
1756 of Fluid in Drill Pipe
40 of Oil&Gas cut Watery Mud
124 of Oil%Gas Cut Muddy Water
62 of Sli.Oil&GAs Cut Water
1560 of Water
80000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3329 to 3364
Formation tested: Arbuckle
Date, Time: 10-DEC-97; 07:40:15
Initial Hydro Pressure: 1629 PSI
First Initial Flow Pressure: 40 PSI
First Final Flow Pressure: 132 PSI
Initial Shut-in Pressure: 937 PSI
Second Initial Flow Pressure: 140 PSI
Second Final Flow Pressure: 217 PSI
Final Shut-in Pressure: 885 PSI
Final Hydro Pressure: 1629 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3299 ft.
Initial Flow: Weak building to a strong blow in 4 minutes
Final Flow: Weak building to a strong blow in 10 minutes no blow back on shutins
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
566 of Total Fluid
30 of Fluid in Drill Collars
536 of Fluid in Drill Pipe
380 of Clean Oil
186 of Slightly muddy gassy oil
40 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.