Drill Stem Tests Database
Specific Well--15-025-21147
API: 15-025-21147
Operator: Marmik Oil Co.
Field: Snake Creek
Lease: Tuttle 'A'
Well 2-4
Location: T35S R21W, Sec. 4, N2 N2
570 South, 2640 West, from NE corner
Longitude: -99.6045367
Latitude: 37.0305991
County: Clark
Status: D&A
Spud Date: 07/05/1996
Completion Date: 07/19/1996
Plugging Date: 07/31/1996
Total Depth: 5854
Form. at depth: MISSISSIPPIAN
Elevation: 1877 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4430 to 4445
Formation tested: Toronto
Date, Time: 07/12/1996; 22:22:50
Initial Hydro Pressure: 2266 PSI
First Initial Flow Pressure: 60 PSI
First Final Flow Pressure: 73 PSI
Initial Shut-in Pressure: 1615 PSI
Second Initial Flow Pressure: 82 PSI
Second Final Flow Pressure: 103 PSI
Final Shut-in Pressure: 1650 PSI
Final Hydro Pressure: 2198 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 362 ft.
Drill Pipe Length: 4063 ft.
Initial Flow - Fair blow, built to bottom of bucket in 20 minutes
Final Flow Strong blow, built to bottom of bucket in 4 minutes
Final Shutin - Bled off 2"", surface blow built to .5""
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Collars
730 of Gas in pipe
8 of Drilling mud
91 of Gassy mud & oil - 60% Gas, 10% Oil, 30% Mud
91 of Oil & gas cut watery mud -
42.2 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4430 to 4445
Formation tested: Toronto
Date, Time: 07/12/1996; 11:19:16
Initial Hydro Pressure: 2266 PSI
First Initial Flow Pressure: 60 PSI
First Final Flow Pressure: 73 PSI
Initial Shut-in Pressure: 1615 PSI
Second Initial Flow Pressure: 82 PSI
Second Final Flow Pressure: 103 PSI
Final Shut-in Pressure: 1650 PSI
Final Hydro Pressure: 2198 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 362 ft.
Drill Pipe Length: 4063 ft.
Initial Flow - Fair blow, built to bottom of bucket in 20 minutes
Final Flow Strong blow, built to bottom of bucket in 4 minutes
Final Shutin - Bled off 2"", surface blow built to .5""
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Collars
730 of Gas in pipe
8 of Drilling mud
91 of Gassy mud & oil - 60% Gas, 10% Oil, 30% Mud
91 of Oil & gas cut watery mud -
42.2 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5635 to 5753
Formation tested: Chester
Date, Time: 07/17/1996; 15:34:54
Initial Hydro Pressure: 2919 PSI
First Initial Flow Pressure: 65 PSI
First Final Flow Pressure: 104 PSI
Initial Shut-in Pressure: 173 PSI
Second Initial Flow Pressure: 148 PSI
Second Final Flow Pressure: 185 PSI
Final Shut-in Pressure: 179 PSI
Final Hydro Pressure: 2811 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 271 ft.
Drill Pipe Length: 5370 ft.
Initial Flow - Weak surface blow built to 1"" blow
Final Flow - No blow
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of Drilling mud
View Pressures No Recovery Gas data.