|
API: 15-025-21147
Operator: Marmik Oil Co. Field: Snake Creek Lease: Tuttle 'A' Well 2-4 |
Location: T35S R21W, Sec. 4, N2 N2
570 South, 2640 West, from NE corner Longitude: -99.6045367 Latitude: 37.0305991 County: Clark Status: D&A |
Spud Date: 07/05/1996
Completion Date: 07/19/1996 Plugging Date: 07/31/1996 Total Depth: 5854 Form. at depth: MISSISSIPPIAN Elevation: 1877 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4430 to 4445
Formation tested: Toronto | Date, Time: 07/12/1996; 22:22:50 |
|
Initial Hydro Pressure: 2266 PSI
First Initial Flow Pressure: 60 PSI First Final Flow Pressure: 73 PSI Initial Shut-in Pressure: 1615 PSI Second Initial Flow Pressure: 82 PSI Second Final Flow Pressure: 103 PSI Final Shut-in Pressure: 1650 PSI Final Hydro Pressure: 2198 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 362 ft. Drill Pipe Length: 4063 ft. |
|
Initial Flow - Fair blow, built to bottom of bucket in 20 minutes Final Flow Strong blow, built to bottom of bucket in 4 minutes Final Shutin - Bled off 2"", surface blow built to .5"" |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 190 of Total Fluid 190 of Fluid in Drill Collars 730 of Gas in pipe 8 of Drilling mud 91 of Gassy mud & oil - 60% Gas, 10% Oil, 30% Mud 91 of Oil & gas cut watery mud - 42.2 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4430 to 4445
Formation tested: Toronto | Date, Time: 07/12/1996; 11:19:16 |
|
Initial Hydro Pressure: 2266 PSI
First Initial Flow Pressure: 60 PSI First Final Flow Pressure: 73 PSI Initial Shut-in Pressure: 1615 PSI Second Initial Flow Pressure: 82 PSI Second Final Flow Pressure: 103 PSI Final Shut-in Pressure: 1650 PSI Final Hydro Pressure: 2198 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 362 ft. Drill Pipe Length: 4063 ft. |
|
Initial Flow - Fair blow, built to bottom of bucket in 20 minutes Final Flow Strong blow, built to bottom of bucket in 4 minutes Final Shutin - Bled off 2"", surface blow built to .5"" |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 190 of Total Fluid 190 of Fluid in Drill Collars 730 of Gas in pipe 8 of Drilling mud 91 of Gassy mud & oil - 60% Gas, 10% Oil, 30% Mud 91 of Oil & gas cut watery mud - 42.2 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5635 to 5753
Formation tested: Chester | Date, Time: 07/17/1996; 15:34:54 |
|
Initial Hydro Pressure: 2919 PSI
First Initial Flow Pressure: 65 PSI First Final Flow Pressure: 104 PSI Initial Shut-in Pressure: 173 PSI Second Initial Flow Pressure: 148 PSI Second Final Flow Pressure: 185 PSI Final Shut-in Pressure: 179 PSI Final Hydro Pressure: 2811 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 271 ft. Drill Pipe Length: 5370 ft. |
|
Initial Flow - Weak surface blow built to 1"" blow Final Flow - No blow |
|
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 120 of Total Fluid 120 of Fluid in Drill Collars 120 of Drilling mud | |
| View Pressures | No Recovery Gas data. |