Drill Stem Tests Database
Specific Well--15-033-20910
API: 15-033-20910
Operator: Samuel Gary Jr. and Assoc., Inc.
Field: Colter West
Lease: Webster
Well 3-3
Location: T33S R19W, Sec. 3, NW NE NW
560 South, 1650 East, from NW corner
Longitude: -99.3759931
Latitude: 37.2059194
County: Comanche
Status: OIL
Spud Date: 04/26/1996
Completion Date: 05/25/1996
Plugging Date:
Total Depth: 6200
Form. at depth: ARBUCKLE GROUP
Elevation: 1945 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4920 to 4943
Formation tested: MARMATON
Date, Time: 05/02/1996; 18:58:48
Initial Hydro Pressure: 2443 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 20 PSI
Initial Shut-in Pressure: 1867 PSI
Second Initial Flow Pressure: 17 PSI
Second Final Flow Pressure: 26 PSI
Final Shut-in Pressure: 1859 PSI
Final Hydro Pressure: 2411 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 186 ft.
Drill Pipe Length: 4724 ft.
Initial Flow - Strong, bottom of bucket in 2 min
Initial Shutin - Bled off blow, no blow back
Final Flow - Strong, bottom of bucket as soon as tool opened, Gas to surface in 40 min
Final Shutin - Bled off blow, no blow back
Bottom Hole Temperature: 135 DEG F
Percent Porosity:
Samples: GAS SAMPLE TAKEN
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Drilling mud w/ show of oil in tool
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5826 to 5842
Formation tested: VIOLA
Date, Time: 05/06/1996; 03:30:50
Initial Hydro Pressure: 2838 PSI
First Initial Flow Pressure: 1177 PSI
First Final Flow Pressure: 1250 PSI
Initial Shut-in Pressure: 2177 PSI
Second Initial Flow Pressure: 1154 PSI
Second Final Flow Pressure: 1463 PSI
Final Shut-in Pressure: 2176 PSI
Final Hydro Pressure: 2753 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 186 ft.
Drill Pipe Length: 5625 ft.
Initial Flow - Strong, bottom of bucket in 10 sec; Gas to surface in 2 min (gauged)
Final Flow - Strong, bottom of bucket as soon as tool opened
Bottom Hole Temperature: 131 DEG F
Percent Porosity:
Samples: GAS SAMPLE TAKEN
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
30 of CONDENSATE
View Pressures View Recovery Gas