Drill Stem Tests Database
Specific Well--15-033-20910
API: 15-033-20910
Operator: Samuel Gary Jr. and Assoc., Inc.
Field: Colter West
Lease: Webster
Well 3-3
Location: T33S R19W, Sec. 3, NW NE NW
560 South, 1650 East, from NW corner
Longitude: -99.3759931
Latitude: 37.2059194
County: Comanche
Status: OIL
Spud Date: 26-APR-96
Completion Date: 25-MAY-96
Plugging Date:
Total Depth: 6200
Form. at depth: ARBUCKLE GROUP
Elevation: 1945 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4920 to 4943
Formation tested: MARMATON
Date, Time: 02-MAY-96; 18:58:48
Initial Hydro Pressure: 2443 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 20 PSI
Initial Shut-in Pressure: 1867 PSI
Second Initial Flow Pressure: 17 PSI
Second Final Flow Pressure: 26 PSI
Final Shut-in Pressure: 1859 PSI
Final Hydro Pressure: 2411 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 186 ft.
Drill Pipe Length: 4724 ft.
Initial Flow - Strong, bottom of bucket in 2 min
Initial Shutin - Bled off blow, no blow back
Final Flow - Strong, bottom of bucket as soon as tool opened, Gas to surface in 40 min
Final Shutin - Bled off blow, no blow back
Bottom Hole Temperature: 135 DEG F
Percent Porosity:
Samples: GAS SAMPLE TAKEN
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Drilling mud w/ show of oil in tool
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5826 to 5842
Formation tested: VIOLA
Date, Time: 06-MAY-96; 03:30:50
Initial Hydro Pressure: 2838 PSI
First Initial Flow Pressure: 1177 PSI
First Final Flow Pressure: 1250 PSI
Initial Shut-in Pressure: 2177 PSI
Second Initial Flow Pressure: 1154 PSI
Second Final Flow Pressure: 1463 PSI
Final Shut-in Pressure: 2176 PSI
Final Hydro Pressure: 2753 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 186 ft.
Drill Pipe Length: 5625 ft.
Initial Flow - Strong, bottom of bucket in 10 sec; Gas to surface in 2 min (gauged)
Final Flow - Strong, bottom of bucket as soon as tool opened
Bottom Hole Temperature: 131 DEG F
Percent Porosity:
Samples: GAS SAMPLE TAKEN
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
30 of CONDENSATE
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.