|
API: 15-033-20910
Operator: Samuel Gary Jr. and Assoc., Inc. Field: Colter West Lease: Webster Well 3-3 |
Location: T33S R19W, Sec. 3, NW NE NW
560 South, 1650 East, from NW corner Longitude: -99.3759931 Latitude: 37.2059194 County: Comanche Status: OIL |
Spud Date: 04/26/1996
Completion Date: 05/25/1996 Plugging Date: Total Depth: 6200 Form. at depth: ARBUCKLE GROUP Elevation: 1945 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4920 to 4943
Formation tested: MARMATON | Date, Time: 05/02/1996; 18:58:48 |
|
Initial Hydro Pressure: 2443 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 20 PSI Initial Shut-in Pressure: 1867 PSI Second Initial Flow Pressure: 17 PSI Second Final Flow Pressure: 26 PSI Final Shut-in Pressure: 1859 PSI Final Hydro Pressure: 2411 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 186 ft. Drill Pipe Length: 4724 ft. |
|
Initial Flow - Strong, bottom of bucket in 2 min Initial Shutin - Bled off blow, no blow back Final Flow - Strong, bottom of bucket as soon as tool opened, Gas to surface in 40 min Final Shutin - Bled off blow, no blow back |
|
|
Bottom Hole Temperature: 135 DEG F
Percent Porosity: Samples: GAS SAMPLE TAKEN Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Drilling mud w/ show of oil in tool | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5826 to 5842
Formation tested: VIOLA | Date, Time: 05/06/1996; 03:30:50 |
|
Initial Hydro Pressure: 2838 PSI
First Initial Flow Pressure: 1177 PSI First Final Flow Pressure: 1250 PSI Initial Shut-in Pressure: 2177 PSI Second Initial Flow Pressure: 1154 PSI Second Final Flow Pressure: 1463 PSI Final Shut-in Pressure: 2176 PSI Final Hydro Pressure: 2753 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 186 ft. Drill Pipe Length: 5625 ft. |
|
Initial Flow - Strong, bottom of bucket in 10 sec; Gas to surface in 2 min (gauged) Final Flow - Strong, bottom of bucket as soon as tool opened |
|
|
Bottom Hole Temperature: 131 DEG F
Percent Porosity: Samples: GAS SAMPLE TAKEN Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 30 of CONDENSATE | |
| View Pressures | View Recovery Gas |