Drill Stem Tests Database
Specific Well--15-033-20940
API: 15-033-20940
Operator: Helmerich and Payne, Inc.
Field: Wildcat
Lease: Brass
Well 1-8
Location: T32S R18W, Sec. 8, W2 W2 NE
1320 South, 2310 West, from NE corner
Longitude: -99.299626
Latitude: 37.2770643
County: Comanche
Status: D&A
Spud Date: 13-SEP-97
Completion Date: 23-OCT-97
Plugging Date: 21-MAY-98
Total Depth: 6088
Form. at depth: ARBUCKLE GROUP
Elevation: 2156 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 5688 to 5745
Formation tested: Viola
Date, Time: 23-SEP-97; 21:20:38
Initial Hydro Pressure: 2798 PSI
First Initial Flow Pressure: 47 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 215 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 37 PSI
Final Shut-in Pressure: 222 PSI
Final Hydro Pressure: 2792 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 212 ft.
Drill Pipe Length: 5462 ft.
Initial Flow: Weak blow, slow increase to 5"" Initial Shut In: No blow after blow down
Final Flow: Fair blow. 2 - 8 ""
Final Shut In: No blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
165 of Gas in pipe.
15 of Drilling Mud
9800 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 5064 to 5223
Formation tested: Pawnee/Miss
Date, Time: 21-SEP-97; 10:29:40
Initial Hydro Pressure: 2405 PSI
First Initial Flow Pressure: 104 PSI
First Final Flow Pressure: 57 PSI
Initial Shut-in Pressure: 1663 PSI
Second Initial Flow Pressure: 119 PSI
Second Final Flow Pressure: 72 PSI
Final Shut-in Pressure: 1704 PSI
Final Hydro Pressure: 2426 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 122 ft.
Drill Pipe Length: 4925 ft.
Initial Flow: Strong blow, Gas to Surface in 12 mins See gas volume report Initial Shut In: No blow after blow down
Final Flow: Strong blow, See gas volume report
Final Shut In: Weak blow after blow down.
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 10
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
122 of Fluid in Drill Collars
8 of Fluid in Drill Pipe
130 of Drilling Mud
9500 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.