API: 15-033-20940
Operator: Helmerich and Payne, Inc. Field: Wildcat Lease: Brass Well 1-8 |
Location: T32S R18W, Sec. 8, W2 W2 NE
1320 South, 2310 West, from NE corner Longitude: -99.299626 Latitude: 37.2770643 County: Comanche Status: D&A |
Spud Date: 13-SEP-97
Completion Date: 23-OCT-97 Plugging Date: 21-MAY-98 Total Depth: 6088 Form. at depth: ARBUCKLE GROUP Elevation: 2156 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5688 to 5745
Formation tested: Viola | Date, Time: 23-SEP-97; 21:20:38 |
Initial Hydro Pressure: 2798 PSI
First Initial Flow Pressure: 47 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: 215 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 222 PSI Final Hydro Pressure: 2792 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 212 ft. Drill Pipe Length: 5462 ft. |
Initial Flow: Weak blow, slow increase to 5"" Initial Shut In: No blow after blow down Final Flow: Fair blow. 2 - 8 "" Final Shut In: No blow |
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 165 of Gas in pipe. 15 of Drilling Mud 9800 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5064 to 5223
Formation tested: Pawnee/Miss | Date, Time: 21-SEP-97; 10:29:40 |
Initial Hydro Pressure: 2405 PSI
First Initial Flow Pressure: 104 PSI First Final Flow Pressure: 57 PSI Initial Shut-in Pressure: 1663 PSI Second Initial Flow Pressure: 119 PSI Second Final Flow Pressure: 72 PSI Final Shut-in Pressure: 1704 PSI Final Hydro Pressure: 2426 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 122 ft. Drill Pipe Length: 4925 ft. |
Initial Flow: Strong blow, Gas to Surface in 12 mins See gas volume report Initial Shut In: No blow after blow down Final Flow: Strong blow, See gas volume report Final Shut In: Weak blow after blow down. |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 10 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 130 of Total Fluid 122 of Fluid in Drill Collars 8 of Fluid in Drill Pipe 130 of Drilling Mud 9500 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |