API: 15-033-20941
Operator: Samuel Gary Jr. and Assoc., Inc. Field: Schumacher North Lease: Selzer Well 16-2X |
Location: T34S R20W, Sec. 16, NE SE SE NW
2130 South, 2409 East, from NW corner Longitude: -99.4973603 Latitude: 37.0848013 County: Comanche Status: OIL-P&A |
Spud Date: 29-SEP-97
Completion Date: 09-DEC-97 Plugging Date: 13-MAR-13 Total Depth: 6316 Form. at depth: ARBUCKLE GROUP Elevation: 1770 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5885 to 5942
Formation tested: Viola | Date, Time: 13-OCT-97; 03:41:49 |
Initial Hydro Pressure: 2986 PSI
First Initial Flow Pressure: 127 PSI First Final Flow Pressure: 145 PSI Initial Shut-in Pressure: 2180 PSI Second Initial Flow Pressure: 177 PSI Second Final Flow Pressure: 383 PSI Final Shut-in Pressure: 2018 PSI Final Hydro Pressure: 2753 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 299 ft. Drill Pipe Length: 5582 ft. |
Initial Flow: Weak blow, built to bottom of bucket in 8 minutes Initial Shut In: Bled bown for 5 mins, no blow back Final Flow: Weak blow, built to bottom of bucket in 9 minutes Final Shut In: Bled down for 5 mins, no blow back |
|
Bottom Hole Temperature: 138 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 830 of Total Fluid 300 of Fluid in Drill Collars 530 of Fluid in Drill Pipe 210 of Slightly Gassy Water Cut Mud 620 of Mud Stained Water 150000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 6192 to 6214
Formation tested: Simpson | Date, Time: 15-OCT-97; 14:32:18 |
Initial Hydro Pressure: 3046 PSI
First Initial Flow Pressure: 182 PSI First Final Flow Pressure: 216 PSI Initial Shut-in Pressure: 2402 PSI Second Initial Flow Pressure: 256 PSI Second Final Flow Pressure: 819 PSI Final Shut-in Pressure: 2394 PSI Final Hydro Pressure: 2940 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 299 ft. Drill Pipe Length: 5887 ft. |
Initial Flow: Strong blow, bottom of bucket in 1 min Initial Shut In: Gas to surface in 3 mins, bled down for 15 mins, Built back to bottom of bucket in 20 mins Final Flow: Gauge gas, sample taken 5 mins into flow period Final Shut In: Bled down 15 mins, bottom of bucket in 10 mins |
|
Bottom Hole Temperature: 151 DEG F
Percent Porosity: Samples: Caraway analytical/Liberal,Ks. Gas Recovery: Comments: | |
Recovery 2300 of Total Fluid 299 of Fluid in Drill Collars 2001 of Fluid in Drill Pipe 3591 of Gas In Pipe 369 of Free Oil 188 of Very Gassy Oil Cut Mud 1743 of Salt Water 90000 of Salinity (PPM) 48 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 6247 to 6284
Formation tested: Arbuckle | Date, Time: 17-OCT-97; 11:42:59 |
Initial Hydro Pressure: 3155 PSI
First Initial Flow Pressure: 77 PSI First Final Flow Pressure: 82 PSI Initial Shut-in Pressure: 1906 PSI Second Initial Flow Pressure: 101 PSI Second Final Flow Pressure: 201 PSI Final Shut-in Pressure: 1746 PSI Final Hydro Pressure: 2904 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 299 ft. Drill Pipe Length: 5927 ft. |
Initial Flow: Fair blow, built to bottom of bucket in 1 minute Initial Shut In: Bled down for 5 minutes, blow back to 4"" in water bucket Final Flow: Fair blow, built to bottom of bucket in 45 seconds, Gas to surface 27 mins Final Shut In: |
|
Bottom Hole Temperature: 144 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 568 of Total Fluid 299 of Fluid in Drill Collars 269 of Fluid in Drill Pipe 5359 of Gas In Pipe 75 of Gassy Heavy Oil Cut Mud/ 16%gas 40%oil 44%mud 120 of Gassy Oil Cut Mud 120 of Gassy Slightly Mud & Oil Cut Water 120 of Mud & Oil Stained Water/ 1%mud 3%oil 96%water 133 of Salt Water 1%mud 99%water 125000 of Salinity (PPM) 46 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |