Drill Stem Tests Database
Specific Well--15-033-20941
API: 15-033-20941
Operator: Samuel Gary Jr. and Assoc., Inc.
Field: Schumacher North
Lease: Selzer
Well 16-2X
Location: T34S R20W, Sec. 16, NE SE SE NW
2130 South, 2409 East, from NW corner
Longitude: -99.4973603
Latitude: 37.0848013
County: Comanche
Status: OIL-P&A
Spud Date: 29-SEP-97
Completion Date: 09-DEC-97
Plugging Date: 13-MAR-13
Total Depth: 6316
Form. at depth: ARBUCKLE GROUP
Elevation: 1770 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 5885 to 5942
Formation tested: Viola
Date, Time: 13-OCT-97; 03:41:49
Initial Hydro Pressure: 2986 PSI
First Initial Flow Pressure: 127 PSI
First Final Flow Pressure: 145 PSI
Initial Shut-in Pressure: 2180 PSI
Second Initial Flow Pressure: 177 PSI
Second Final Flow Pressure: 383 PSI
Final Shut-in Pressure: 2018 PSI
Final Hydro Pressure: 2753 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 299 ft.
Drill Pipe Length: 5582 ft.
Initial Flow: Weak blow, built to bottom of bucket in 8 minutes Initial Shut In: Bled bown for 5 mins, no blow back
Final Flow: Weak blow, built to bottom of bucket in 9 minutes
Final Shut In: Bled down for 5 mins, no blow back
Bottom Hole Temperature: 138 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
830 of Total Fluid
300 of Fluid in Drill Collars
530 of Fluid in Drill Pipe
210 of Slightly Gassy Water Cut Mud
620 of Mud Stained Water
150000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 6192 to 6214
Formation tested: Simpson
Date, Time: 15-OCT-97; 14:32:18
Initial Hydro Pressure: 3046 PSI
First Initial Flow Pressure: 182 PSI
First Final Flow Pressure: 216 PSI
Initial Shut-in Pressure: 2402 PSI
Second Initial Flow Pressure: 256 PSI
Second Final Flow Pressure: 819 PSI
Final Shut-in Pressure: 2394 PSI
Final Hydro Pressure: 2940 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 299 ft.
Drill Pipe Length: 5887 ft.
Initial Flow: Strong blow, bottom of bucket in 1 min Initial Shut In: Gas to surface in 3 mins, bled down for 15 mins, Built back to bottom of bucket in 20 mins
Final Flow: Gauge gas, sample taken 5 mins into flow period
Final Shut In: Bled down 15 mins, bottom of bucket in 10 mins
Bottom Hole Temperature: 151 DEG F
Percent Porosity:
Samples: Caraway analytical/Liberal,Ks.
Gas Recovery:
Comments:
Recovery
2300 of Total Fluid
299 of Fluid in Drill Collars
2001 of Fluid in Drill Pipe
3591 of Gas In Pipe
369 of Free Oil
188 of Very Gassy Oil Cut Mud
1743 of Salt Water
90000 of Salinity (PPM)
48 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 6247 to 6284
Formation tested: Arbuckle
Date, Time: 17-OCT-97; 11:42:59
Initial Hydro Pressure: 3155 PSI
First Initial Flow Pressure: 77 PSI
First Final Flow Pressure: 82 PSI
Initial Shut-in Pressure: 1906 PSI
Second Initial Flow Pressure: 101 PSI
Second Final Flow Pressure: 201 PSI
Final Shut-in Pressure: 1746 PSI
Final Hydro Pressure: 2904 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 299 ft.
Drill Pipe Length: 5927 ft.
Initial Flow: Fair blow, built to bottom of bucket in 1 minute Initial Shut In: Bled down for 5 minutes, blow back to 4"" in water bucket
Final Flow: Fair blow, built to bottom of bucket in 45 seconds, Gas to surface 27 mins
Final Shut In:
Bottom Hole Temperature: 144 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
568 of Total Fluid
299 of Fluid in Drill Collars
269 of Fluid in Drill Pipe
5359 of Gas In Pipe
75 of Gassy Heavy Oil Cut Mud/ 16%gas 40%oil 44%mud
120 of Gassy Oil Cut Mud
120 of Gassy Slightly Mud & Oil Cut Water
120 of Mud & Oil Stained Water/ 1%mud 3%oil 96%water
133 of Salt Water 1%mud 99%water
125000 of Salinity (PPM)
46 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.