API: 15-033-20991
Operator: MARMIK OIL CO. Field: Tuttle Lease: Snake Creek Ranch Well 1-6 |
Location: T35S R20W, Sec. 6, NW SE NW
1520 South, 1750 East, from NW corner Longitude: -99.5349533 Latitude: 37.0283197 County: Comanche Status: D&A |
Spud Date: 14-JAN-99
Completion Date: 06-FEB-99 Plugging Date: 06-FEB-99 Total Depth: 7350 Form. at depth: ARBUCKLE Elevation: 1768 KB |
ACO-1 elevations of GL 1710, KB 1722 are low based on topo. Geo Log has GL 1756, DF 1766, KB 1768. |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4146 to 4155
Formation tested: Elgin Sd. | Date, Time: 20-JAN-99; 17:06:07 |
Initial Hydro Pressure: 1986 PSI
First Initial Flow Pressure: 98 PSI First Final Flow Pressure: 100 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1964 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 362 ft. Drill Pipe Length: 3784 ft. |
Initial Flow: Weak blow throughout 1"" to 2 1/2"" | |
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 100 of Total Fluid 100 of Fluid in Drill Collars 100 of mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4146 to 4155
Formation tested: Elgin SD. | Date, Time: 21-JAN-99; 03:01:06 |
Initial Hydro Pressure: 2003 PSI
First Initial Flow Pressure: 38 PSI First Final Flow Pressure: 108 PSI Initial Shut-in Pressure: 1604 PSI Second Initial Flow Pressure: 117 PSI Second Final Flow Pressure: 166 PSI Final Shut-in Pressure: 1594 PSI Final Hydro Pressure: 1954 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 362 ft. Drill Pipe Length: 3756 ft. |
Initial Flow: Weak building to a strong blow in 14 mins. Final Flow: Weak building to a strong blow in 4 mins. |
|
Bottom Hole Temperature: 108 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 420 of Total Fluid 362 of Fluid in Drill Collars 58 of Fluid in Drill Pipe 3390 of gas in pipe 50 of Heavy oil and gas cut mud 190 of Gassy muddy oil 73% gas 17% oil 10% mud 90 of Slight oil cut muddy water 90 of Water 96000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5408 to 5585
Formation tested: Morrow | Date, Time: 26-JAN-99; 00:51:15 |
Initial Hydro Pressure: 2767 PSI
First Initial Flow Pressure: 1135 PSI First Final Flow Pressure: 1743 PSI Initial Shut-in Pressure: 1951 PSI Second Initial Flow Pressure: 1796 PSI Second Final Flow Pressure: 1949 PSI Final Shut-in Pressure: 1959 PSI Final Hydro Pressure: 2655 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 270 ft. Drill Pipe Length: 5131 ft. |
IF:Strong blow. Btm. of bucket in 30 secs. ISI:Weak blow. (1/2"") FF:Strong blow. Btm. of bucket in 90 secs. FSI:Fair blow. ( 4 - 7"") GTS 20 mins. in to FSIP. | |
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 20 Samples: none Gas Recovery: Comments: | |
Recovery 4070 of Total Fluid 270 of Fluid in Drill Collars 3800 of Fluid in Drill Pipe 430 of GCM 12%g 12%w 76%m 280 of GCMW 10%g 40%m 50%w 3360 of GCMW 3%g 15%m 82%w 116000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |