Drill Stem Tests Database
Specific Well--15-039-20901
API: 15-039-20901
Operator: MURFIN DRILLING CO
Field: Monaghan Northeast
Lease: LONG
Well 1-14
Location: T2S R27W, Sec. 14, NW NW SE
2310 North, 2310 West, from SE corner
Longitude: -100.3175091
Latitude: 39.8780268
County: Decatur
Status: D&A
Spud Date: 28-JAN-97
Completion Date: 04-FEB-97
Plugging Date: 04-FEB-97
Total Depth: 3740
Form. at depth: KANSAS CITY GROUP
Elevation: 2616 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3428 to 3505
Formation tested: Oread/Toronto
Date, Time: 31-JAN-97; 19:36:04
Initial Hydro Pressure: 1785 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 42 PSI
Initial Shut-in Pressure: 1118 PSI
Second Initial Flow Pressure: 46 PSI
Second Final Flow Pressure: 62 PSI
Final Shut-in Pressure: 1103 PSI
Final Hydro Pressure: 1708 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 505 ft.
Drill Pipe Length: 2924 ft.
Initial Flow: Weak blow, built to 1"" Initial Shut In:
Final Flow: No blow
Final Shut In:
Bottom Hole Temperature: 100 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of Drilling Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3507 to 3528
Formation tested: Lansing KC ""B""
Date, Time: 01-FEB-97; 16:55:24
Initial Hydro Pressure: 1830 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 38 PSI
Initial Shut-in Pressure: 1133 PSI
Second Initial Flow Pressure: 39 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 1121 PSI
Final Hydro Pressure: 1789 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 505 ft.
Drill Pipe Length: 2980 ft.
Initial Flow: Weak blow, built to 4"" Initial Shut In:
Final Flow: Weak blow, built to 3""
Final Shut In:
Bottom Hole Temperature: 101 DEG F
Percent Porosity: 8
Samples:
Gas Recovery:
Comments:
Recovery
105 of Total Fluid
105 of Fluid in Drill Collars
325 of Gas in pipe
45 of Clean gassy oil 20%g 80%o
60 of Mud cut Gassy oil 10%g 60%o 30%m
30 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3523 to 3552
Formation tested: Lansing KC ""C""
Date, Time: 02-FEB-97; 08:08:56
Initial Hydro Pressure: 1836 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 80 PSI
Initial Shut-in Pressure: 1146 PSI
Second Initial Flow Pressure: 83 PSI
Second Final Flow Pressure: 149 PSI
Final Shut-in Pressure: 1127 PSI
Final Hydro Pressure: 1785 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 505 ft.
Drill Pipe Length: 3002 ft.
Initial Flow: Weak blow, built to 4"" Initial Shut In:
Final Flow: Weak blow, built to 1""
Final Shut In:
Bottom Hole Temperature: 108 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
270 of Total Fluid
270 of Fluid in Drill Collars
270 of Muddy water
18000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3642 to 3670
Formation tested: Lansing KC
Date, Time: 03-FEB-97; 05:35:00
Initial Hydro Pressure: 1970 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 32 PSI
Initial Shut-in Pressure: 454 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 37 PSI
Final Shut-in Pressure: 142 PSI
Final Hydro Pressure: 1864 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 505 ft.
Drill Pipe Length: 3132 ft.
Initial Flow: Weak blow, Built to 1.5"" Initial Shut In:
Final Flow: Weak blow, died in 16 mins
Final Shut In:
Bottom Hole Temperature: 101 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
17 of Total Fluid
17 of Fluid in Drill Collars
100 of Gas in pipe
2 of Clean Oil
15 of Heavy Mud cut Oil 70% oil 30% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.