|
API: 15-047-21419
Operator: Rick's Exploration, Inc. Field: Martin North Lease: RUBY-JERRY Well 20-A |
Location: T26S R20W, Sec. 20, S2 SE SW
400 North, 1980 East, from SW corner Longitude: -99.5350243 Latitude: 37.7647226 County: Edwards Status: GAS-P&A |
Spud Date: 23-JAN-97
Completion Date: 15-MAR-97 Plugging Date: 28-DEC-99 Total Depth: 4900 Form. at depth: MISSISSIPPIAN Elevation: 2262 KB |
| Discovery well for Martin North field. | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4780 to 4790
Formation tested: MISS. | Date, Time: 02-FEB-97; 02:48:54 |
|
Initial Hydro Pressure: 2256 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 27 PSI Initial Shut-in Pressure: 1503 PSI Second Initial Flow Pressure: 25 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 1531 PSI Final Hydro Pressure: 2269 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4762 ft. |
|
Initial Flow: No blow Initial Shut In: Final Flow: Weak blow, built to bottom of bucket in 40 mins Final Shut In: |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 70 of Total Fluid 70 of Fluid in Drill Pipe 70 of 6%gas 24%oil 26%water 44%mud 30000 of Salinity (PPM) 39 of Gravity (API) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4800 to 4822
Formation tested: MISS. | Date, Time: 03-FEB-97; 03:53:13 |
|
Initial Hydro Pressure: 2331 PSI
First Initial Flow Pressure: 43 PSI First Final Flow Pressure: 104 PSI Initial Shut-in Pressure: 1509 PSI Second Initial Flow Pressure: 143 PSI Second Final Flow Pressure: 395 PSI Final Shut-in Pressure: 1466 PSI Final Hydro Pressure: 2263 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4791 ft. |
|
Initial FLow: Fair blow, built to bottom of bucket in 12 mins Initial Shut In: Final Flow: Fair blow, built to bottom of bucket in 16 mins Final Shut In: |
|
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Rick's Exploration Inc. Gas Recovery: Comments: | |
|
Recovery 817 of Total Fluid 817 of Fluid in Drill Pipe 17 of Watery Mud 54% water 46% mud trace oil 775 of Salty Sulfer Water 5 of Heavy Cut Watery Mud 40000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |