API: 15-051-24914
Operator: Hess Oil Field: Younker Lease: YOUNGER Well 1 |
Location: T12S R19W, Sec. 9, SW SE NW
2700 North, 1900 East, from SW corner Longitude: -99.4386377 Latitude: 39.0233591 County: Ellis Status: D&A |
Spud Date: 14-FEB-96
Completion Date: 20-FEB-96 Plugging Date: 29-FEB-96 Total Depth: 3800 Form. at depth: ARBUCKLE GROUP Elevation: 2176 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3444 to 3540
Formation tested: Lansing A-F | Date, Time: 18-FEB-96; 19:02:46 |
Initial Hydro Pressure: 1669 PSI
First Initial Flow Pressure: 147 PSI First Final Flow Pressure: 211 PSI Initial Shut-in Pressure: 1320 PSI Second Initial Flow Pressure: 217 PSI Second Final Flow Pressure: 262 PSI Final Shut-in Pressure: 1167 PSI Final Hydro Pressure: 1593 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 220 ft. Drill Pipe Length: 3234 ft. |
Initial Flow - 2"" blow building to bottom of bucket in 7 min; severe plugging during initial flow - initial shutin is probably invalid Final Flow - .25"" blow building to 12"" |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 520 of Total Fluid 220 of Fluid in Drill Collars 300 of Fluid in Drill Pipe 240 of Heavy mud 120 of Water cut mud - 20% water, 80% mud 160 of Muddy water - 60% water, 40% mud 50000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 3735 to 3750
Formation tested: Chert | Date, Time: 20-FEB-96; 04:01:18 |
Initial Hydro Pressure: 1822 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 20 PSI Initial Shut-in Pressure: 32 PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1795 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 220 ft. Drill Pipe Length: 3510 ft. |
Initial Flow - Weak 1/4"" blow died in 8 minutes Final Flow - None taken |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |