Drill Stem Tests Database
Specific Well--15-051-24949
API: 15-051-24949
Operator: John O. Farmer, Inc.
Field: Solomon South
Lease: Solomon
Well 1
Location: T11S R19W, Sec. 33, NE SE SW
990 North, 2310 East, from SW corner
Longitude: -99.4368111
Latitude: 39.0476987
County: Ellis
Status: D&A
Spud Date: 12/11/1996
Completion Date: 12/17/1996
Plugging Date: 12/17/1996
Total Depth: 3660
Form. at depth: ARBUCKLE GROUP
Elevation: 2123 KB
Elevations changed per ACO-1: GL from 2130, KB from 2130. (DRL 10-17-06)

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3633 to 3666
Formation tested: Arbuckle
Date, Time: 12/16/1996; 01:39:59
Initial Hydro Pressure: 1801 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 116 PSI
Initial Shut-in Pressure: 384 PSI
Second Initial Flow Pressure: 118 PSI
Second Final Flow Pressure: 156 PSI
Final Shut-in Pressure: 265 PSI
Final Hydro Pressure: 1780 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3048 ft.
Initial Flow - . 1"" blow building to 9"" Initial Shut-in - No blow
Final Flow - Weak surface blow building to 5""
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
290 of Total Fluid
290 of Fluid in Drill Pipe
50 of muddy oil 70% oil 30% mud
60 of sl oil cut mud 5% oil 95 % mud
60 of sl oil and water cut mud 5% oil 10% water
60 of muddy water w/ oil scum 45% mud 55% water
60 of muddy water 15% mud 85% water
27000 of Salinity (PPM)
19 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3663 to 3673
Formation tested: Arbuckle
Date, Time: 12/16/1996; 13:20:16
Initial Hydro Pressure: 1825 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 178 PSI
Initial Shut-in Pressure: 1030 PSI
Second Initial Flow Pressure: 184 PSI
Second Final Flow Pressure: 291 PSI
Final Shut-in Pressure: 1025 PSI
Final Hydro Pressure: 1848 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3677 ft.
Initial Flow - 1/2"" blow building to bottom of bucket in 29 minutes Initial Shut-in - No blow
Final Flow - Very weak surface blow building to 4 1/2""
Final Shut-in - No blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
620 of Total Fluid
620 of Fluid in Drill Pipe
620 of slightly muddy water
25000 of Salinity (PPM)
View Pressures No Recovery Gas data.