API: 15-055-21529
Operator: SONAT EXPL Field: Great Eastern Ditch Lease: BAKER Well 5-15 |
Location: T23S R34W, Sec. 15, N2 NE NE
330 South, 660 West, from NE corner Longitude: -101.0312605 Latitude: 38.0606345 County: Finney Status: D&A |
Spud Date: 27-FEB-97
Completion Date: 12-MAR-97 Plugging Date: 12-MAR-97 Total Depth: 4900 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2945 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4599 to 4686
Formation tested: Morrow | Date, Time: 08-MAR-97; 09:01:52 |
Initial Hydro Pressure: 2268 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 43 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 26 PSI Final Shut-in Pressure: 39 PSI Final Hydro Pressure: 2265 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4348 ft. |
Initial Flow: Weak 1/4"" blow throughout Initial Shut In: No blow Final Flow: No return blow Final Shut In: No blow |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 10 of Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4763 to 4824
Formation tested: Mississippi | Date, Time: 09-MAR-97; 13025231- |
Initial Hydro Pressure: 2388 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 17 PSI Initial Shut-in Pressure: 49 PSI Second Initial Flow Pressure: 17 PSI Second Final Flow Pressure: 18 PSI Final Shut-in Pressure: 64 PSI Final Hydro Pressure: 2363 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4472 ft. |
Initial Flow: Weak surface blow died in 11 mins. Initial Shut In: Final Flow: No return blow Final Shut In: |
|
Bottom Hole Temperature: 112 43
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5 of Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: | Data Source: TRILOBITE |
Interval: to
Formation tested: | Date, Time: 11-MAR-97; 13:25:24 |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4503 to 4653
Formation tested: Atoka | Date, Time: 07-MAR-97; 12:51:02 |
Initial Hydro Pressure: 2271 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 995 PSI Second Initial Flow Pressure: 33 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 970 PSI Final Hydro Pressure: 2263 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4317 ft. |
Initial Flow: Weak surface blow built to 1/2"" then decreased to 1/8"" Initial Shut In; No blow Final Flow: No return blow Final Shut In: |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Pipe 15 of Drilling Mud w/Oil Spots in Tool | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |