Drill Stem Tests Database
Specific Well--15-055-21542
API: 15-055-21542
Operator: SONAT EXPLORATION CO.
Field: Amazon Ditch
Lease: TATE 'A'
Well 3-19
Location: T22S R34W, Sec. 19, SW NE NE
990 South, 990 West, from NE corner
Longitude: -101.0879927
Latitude: 38.1312847
County: Finney
Status: OIL
Spud Date: 13-MAR-97
Completion Date: 30-APR-97
Plugging Date:
Total Depth: 4850
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 2980 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3748 to 3770
Formation tested: Toronto
Date, Time: 19-MAR-97; 23359534-t
Initial Hydro Pressure: 1768 PSI
First Initial Flow Pressure: 403 PSI
First Final Flow Pressure: 971 PSI
Initial Shut-in Pressure: 1002 PSI
Second Initial Flow Pressure: 973 PSI
Second Final Flow Pressure: 1002 PSI
Final Shut-in Pressure: 1005 PSI
Final Hydro Pressure: 1757 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3418 ft.
Initial Flow - Bottom of bucket in 30 seconds Initial Shut in - no blow
Final Flow - Bottom of bucket in 5 minutes
Final Shut in - no blow
Bottom Hole Temperature: 103 34
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2170 of Total Fluid
2170 of Fluid in Drill Pipe
20 of Free oil 100% oil
100 of Oil & Water Cut Mud 20%oil 30%water 50%mud
630 of Oil Cut Water 20%oil 80% water
390 of Slight Oil Cut Water 10%oil 90% water
1030 of Salt Water 100% water
53000 of Salinity (PPM)
19.5 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3786 to 3801
Formation tested: Lansing KC-""A""
Date, Time: 20-MAR-97; 03:09:49
Initial Hydro Pressure: 1811 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 70 PSI
Initial Shut-in Pressure: 106 PSI
Second Initial Flow Pressure: 73 PSI
Second Final Flow Pressure: 96 PSI
Final Shut-in Pressure: 108 PSI
Final Hydro Pressure: 1810 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3418 ft.
Initial Flow: Bottom of bucket in 13 min. Initial Shutin No blow
Final Flow Weak surface blow in 3 min. built to 3 1/4""in.
Final Shutin No blow
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
170 of Total Fluid
170 of Fluid in Drill Pipe
15 of Free Oil 100% oil
60 of Oil Cut Mud trace of Water
95 of Salt Water
48500 of Salinity (PPM)
30 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3881 to 3897
Formation tested: Lansing KC-""D""
Date, Time: 21-MAR-97; 00:07:12
Initial Hydro Pressure: 1945 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 84 PSI
Initial Shut-in Pressure: 241 PSI
Second Initial Flow Pressure: 89 PSI
Second Final Flow Pressure: 147 PSI
Final Shut-in Pressure: 242 PSI
Final Hydro Pressure: 1834 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3543 ft.
Initial Flow - Bottom of bucket in 30 min. Initial Shut-in - no blow
Final Flow - surface blow built to 5 1/2""in.
Final Shut-in - weak surface blow in 25 min. 1/4""in.
Bottom Hole Temperature: 106 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
333 of Total Fluid
333 of Fluid in Drill Pipe
75 of Slightly Gassy Oil
195 of Gassy Mud Cut Oil
60 of Muddy Water trace of Oil
36 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3992 to 4023
Formation tested: Lansing KC-""H""
Date, Time: 21-MAR-97; 22:04:30
Initial Hydro Pressure: 1964 PSI
First Initial Flow Pressure: 181 PSI
First Final Flow Pressure: 494 PSI
Initial Shut-in Pressure: 649 PSI
Second Initial Flow Pressure: 514 PSI
Second Final Flow Pressure: 605 PSI
Final Shut-in Pressure: 649 PSI
Final Hydro Pressure: 1928 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3667 ft.
Initial Flow: Bottom of bucket in 1 1/2min. Initial Shut In: No blow
Final Flow: Bottom of bucket in 7 min.
Final Shut In: No blow
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1340 of Total Fluid
1340 of Fluid in Drill Pipe
140 of Muddy Water
240 of Mud Cut Water
960 of Water
25500 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4168 to 4185
Formation tested: Lansing KC-""B""
Date, Time: 22-MAR-97; 19:56:58
Initial Hydro Pressure: 2009 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 100 PSI
Initial Shut-in Pressure: 908 PSI
Second Initial Flow Pressure: 103 PSI
Second Final Flow Pressure: 193 PSI
Final Shut-in Pressure: 886 PSI
Final Hydro Pressure: 2005 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3850 ft.
Initial Flow: 9""in. blow Initial Shut In: no blow
Final Flow: 7""in. blow
Final Shut In: no blow
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
500 of Total Fluid
500 of Fluid in Drill Pipe
5 of Free Oil
75 of Muddy Water
420 of Salt Water
24000 of Salinity (PPM)
34 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.