|
API: 15-055-21558
Operator: NORTH AMERICAN RES Field: Stewart Lease: PAULS Well 5-9 |
Location: T23S R31W, Sec. 9, NE NW NE
4961 North, 1547 West, from SE corner Longitude: -100.72392 Latitude: 38.07461 County: Finney Status: OIL |
Spud Date: 08-MAY-97
Completion Date: 05-JUN-97 Plugging Date: Total Depth: 5000 Form. at depth: MISSISSIPPIAN Elevation: 2891 GL |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4775 to 4830
Formation tested: Morrow | Date, Time: 15-MAY-97; 07:38:17 |
|
Initial Hydro Pressure: 2343 PSI
First Initial Flow Pressure: 41 PSI First Final Flow Pressure: 106 PSI Initial Shut-in Pressure: 307 PSI Second Initial Flow Pressure: 131 PSI Second Final Flow Pressure: 245 PSI Final Shut-in Pressure: 307 PSI Final Hydro Pressure: 2362 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4765 ft. |
|
Initial Blow-Weak-building to 14"" fair blow Initial Shut In - no blow back Final Blow-Weak-building to 10"" fair blow Final Shut In-no blow back |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 484 of Total Fluid 484 of Fluid in Drill Pipe 135 of Gas in pipe 112 of Clean gassy oil 20%g 80%o 124 of Slightly mud cut gassy oil 60%g 35%o 5%m 186 of Oil cut gassy mud 50%g 30%o 20%m 62 of Oil & water cut gassy mud 20%g 10%o 10%w 60%m 30 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |