Drill Stem Tests Database
Specific Well--15-063-21511
API: 15-063-21511
Operator: Parrish Corp.
Field: Missouri Flats Northwest
Lease: Jorgenson
Well 1
Location: T14S R28W, Sec. 21, W2 E2 SW
1320 North, 1650 East, from SW corner
Longitude: -100.4409968
Latitude: 38.8183381
County: Gove
Status: D&A
Spud Date: 03-NOV-97
Completion Date: 13-NOV-97
Plugging Date: 13-NOV-97
Total Depth: 4432
Form. at depth: MISSISSIPPIAN
Elevation: 2615 KB
Test Number: 5 Data Source: TRILOBITE
Interval: 4194 to 4255
Formation tested: Myrik Station
Date, Time: 12-NOV-97; 00:43:32
Initial Hydro Pressure: 2005 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 10 PSI
Initial Shut-in Pressure: 30 PSI
Second Initial Flow Pressure: 9 PSI
Second Final Flow Pressure: 11 PSI
Final Shut-in Pressure: 29 PSI
Final Hydro Pressure: 1952 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4201 ft.
Initial Flow: Weak surface blow built to 1/2"" Initial Shut In: No blow
Final Flow: Weak surface blow steady throughout
Final Shut In: No blow
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Pipe
10 of Drilling Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.