|
API: 15-065-22787
Operator: PIONEER RESOURCES Field: Wildcat Lease: PAKKEBIER Well 1 |
Location: T6S R22W, Sec. 14, NW NW NE
330 South, 2310 West, from NE corner Longitude: -99.7399055 Latitude: 39.5381489 County: Graham Status: D&A |
Spud Date: 08-AUG-97
Completion Date: 15-AUG-97 Plugging Date: 15-AUG-97 Total Depth: 3740 Form. at depth: KANSAS CITY GROUP Elevation: 2281 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3472 to 3525
Formation tested: Toronto | Date, Time: 13-AUG-97; 15:54:32 |
|
Initial Hydro Pressure: 1742 PSI
First Initial Flow Pressure: 10 PSI First Final Flow Pressure: 35 PSI Initial Shut-in Pressure: 1101 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 51 PSI Final Shut-in Pressure: 1070 PSI Final Hydro Pressure: 1717 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 2560 ft. |
|
Initial Flow- weak 1/8"" blow building to 2 1/2"" . Initial Shutin- no blow Final Flow- surface blow building to 2"" Final Shutin- no blow |
|
|
Bottom Hole Temperature: 103 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 65 of Total Fluid 65 of Fluid in Drill Pipe 65 of Oil Specked Watery Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3566 to 3615
Formation tested: Lansing C-E | Date, Time: 14-AUG-97; 09:37:42 |
|
Initial Hydro Pressure: 1811 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 43 PSI Initial Shut-in Pressure: 876 PSI Second Initial Flow Pressure: 44 PSI Second Final Flow Pressure: 59 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1786 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 2654 ft. |
|
Initial Flow- weak surface blow building to 2 1/2"" . Initial Shutin- no blow Final Flow- surface blow building to 3/4"" Final Shutin- no blow |
|
|
Bottom Hole Temperature: 104 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 75 of Total Fluid 65 of Fluid in Drill Pipe 75 of Oil Specked Watery Mud | |
| View Pressures | No Recovery Gas data. |