Drill Stem Tests Database
Specific Well--15-075-20591
API: 15-075-20591
Operator: Amoco Production Co.
Field: Holliday
Lease: Doc Holliday
Well 1-24
Location: T21S R39W, Sec. 24, N2 N2 SE NE
1600 South, 660 West, from NE corner
Longitude: -101.5440583
Latitude: 38.2155135
County: Hamilton
Status: OIL-P&A
Spud Date: 04/10/1996
Completion Date: 06/04/1996
Plugging Date: 08/14/2002
Total Depth: 5428
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 3432 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4955 to 5030
Formation tested: UPPER MORROW
Date, Time: 04/17/1996; 22:15:14
Initial Hydro Pressure: 2393 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 102 PSI
Initial Shut-in Pressure: 1159 PSI
Second Initial Flow Pressure: 117 PSI
Second Final Flow Pressure: 308 PSI
Final Shut-in Pressure: 1077 PSI
Final Hydro Pressure: 2279 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 727 ft.
Drill Pipe Length: 4219 ft.
Initial Flow - .5"" blow built to 10""
Initial Shutin - Bled off blow - no return
Final Flow - Surface blow built to bottom in 6 min
Final Shutin - Bled off blow, weak surface return built to bottom in 40 min
Bottom Hole Temperature: 132 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
880 of Total Fluid
727 of Fluid in Drill Collars
153 of Fluid in Drill Pipe
2820 of Gas in pipe
153 of Clean gassy oil - 20% gas, 80% oil
120 of Clean gassy oil - 40% gas, 60% oil
607 of Gassy oil cut mud - 20% gas, 20% oil, 60% mud
30.2 of Gravity (API)
View Pressures No Recovery Gas data.