Drill Stem Tests Database
Specific Well--15-077-21332
API: 15-077-21332
Operator: Messenger Petroleum, Inc.
Field: Maple Grove South
Lease: Graber
Well 2
Location: T31S R7W, Sec. 1, SW NW
2240 South, 660 East, from NW corner
Longitude: -98.0374659
Latitude: 37.3789968
County: Harper
Status: O&G
Spud Date: 27-AUG-97
Completion Date: 13-SEP-97
Plugging Date:
Total Depth: 4405
Form. at depth: MISSISSIPPIAN
Elevation: 1598 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4323 to 4342
Formation tested: Miss.
Date, Time: 01-SEP-97; 01:09:47
Initial Hydro Pressure: 2151 PSI
First Initial Flow Pressure: 112 PSI
First Final Flow Pressure: 95 PSI
Initial Shut-in Pressure: 1226 PSI
Second Initial Flow Pressure: 68 PSI
Second Final Flow Pressure: 94 PSI
Final Shut-in Pressure: 1218 PSI
Final Hydro Pressure: 2082 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 3769 ft.
Initial Flow: Strong blow bottom of bucket in 4 mins Gas to Surface in 12 mins Initial Shut In: Bled down for 5 mins, no blow back
Final Flow: Strong blow, gauge gas, sample taken at 40 mins
Final Shut In: Bled down for 5 mins, No blow back
Bottom Hole Temperature: 134 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Collars
3569 of Gas In Pipe
140 of Gassy Slightly Watery Mud
60 of Gassy Heavy Water Cut Mud
9000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4340 to 4352
Formation tested: Mississippi
Date, Time: 02-SEP-97; 16:20:08
Initial Hydro Pressure: 2143 PSI
First Initial Flow Pressure: 55 PSI
First Final Flow Pressure: 85 PSI
Initial Shut-in Pressure: 1201 PSI
Second Initial Flow Pressure: 89 PSI
Second Final Flow Pressure: 111 PSI
Final Shut-in Pressure: 1203 PSI
Final Hydro Pressure: 2087 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 3799 ft.
Initial Flow:. Strong blow, Gas to surface in 7 mins Initial Shut In: Bled down for 5 mins, No blow back
Final Flow: Strong blow, Gauge gas
Final Shut In: Bled down for 5 mins, Very slight blow back
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: Caraway analytical L.L.C.
Gas Recovery:
Comments:
Recovery
320 of Total Fluid
320 of Fluid in Drill Collars
120 of Gassy Slight Oil and Water Cut Mud
80 of Gassy Slight Oil and Mud Cut Water
60 of Gassy Oil Mud Cut Water
60 of Gassy Salt Water
22000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.