API: 15-081-21052
Operator: Berexco, Inc. Field: Pleasant Prairie Lease: Batchelder Well 1-6 |
Location: T27S R33W, Sec. 6, SW SW
825 North, 660 East, from SW corner Longitude: -100.9774748 Latitude: 37.7240521 County: Haskell Status: D&A |
Spud Date: 12-OCT-96
Completion Date: 24-OCT-96 Plugging Date: 31-OCT-96 Total Depth: 5406 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2969 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4625 to 4641
Formation tested: Marmaton ""B"" | Date, Time: 19-OCT-96; 23:56:11 |
Initial Hydro Pressure: 2326 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 1233 PSI Second Initial Flow Pressure: 32 PSI Second Final Flow Pressure: 34 PSI Final Shut-in Pressure: 1244 PSI Final Hydro Pressure: 2186 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 639 ft. Drill Pipe Length: 3981 ft. |
Initial Flow - Surface blow throughout Final Flow - Surface blow - died in 10 mins. |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 15 of Drilling mud with trace of oil | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5014 to 5097
Formation tested: Morrow | Date, Time: 21-OCT-96; 02:29:40 |
Initial Hydro Pressure: 2610 PSI
First Initial Flow Pressure: 45 PSI First Final Flow Pressure: 49 PSI Initial Shut-in Pressure: 183 PSI Second Initial Flow Pressure: 119 PSI Second Final Flow Pressure: 60 PSI Final Shut-in Pressure: 321 PSI Final Hydro Pressure: 2365 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 576 ft. Drill Pipe Length: 4413 ft. |
Initial Flow - Weak blow - died in 10 mins. Final Flow - No blow |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 15 of Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5177 to 5209
Formation tested: Chester | Date, Time: 22-OCT-96; 04:49:27 |
Initial Hydro Pressure: 2572 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 398 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 34 PSI Final Shut-in Pressure: 748 PSI Final Hydro Pressure: 2458 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 639 ft. Drill Pipe Length: 4538 ft. |
Initial Flow - Surface blow throughout Final Flow - Surface blow throughout |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of Slightly oil cut mud 20% oil 80% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5228 to 5260
Formation tested: St. Louis | Date, Time: 24-OCT-96; 04:36:53 |
Initial Hydro Pressure: 2702 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 25 PSI Initial Shut-in Pressure: 1106 PSI Second Initial Flow Pressure: 26 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 1324 PSI Final Hydro Pressure: 2503 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 639 ft. Drill Pipe Length: 4573 ft. |
Initial Flow - Surface blow throughout Final Flow - No blow |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |