|
API: 15-081-21074
Operator: AMERICAN WARRIOR INC Field: Victory Lease: MITCHELL 'B' Well 3 |
Location: T30S R33W, Sec. 18, SE NW SE
1638 North, 1635 West, from SE corner Longitude: -100.96738 Latitude: 37.43585 County: Haskell Status: GAS |
Spud Date: 21-NOV-96
Completion Date: 03-DEC-96 Plugging Date: Total Depth: 5524 Form. at depth: MISSISSIPPIAN Elevation: 2967 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4119 to 4174
Formation tested: Lansing ""A"" | Date, Time: 27-NOV-96; 04:53:13 |
|
Initial Hydro Pressure: 2012 PSI
First Initial Flow Pressure: 31 PSI First Final Flow Pressure: 163 PSI Initial Shut-in Pressure: 324 PSI Second Initial Flow Pressure: 166 PSI Second Final Flow Pressure: 183 PSI Final Shut-in Pressure: 324 PSI Final Hydro Pressure: 1982 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 301 ft. Drill Pipe Length: 3851 ft. |
|
Initial Flow - Fair blow - built to 6"" Initial Shut-in - Bled off 2"" - no blow back Final Flow - Weak surface blow for 5 min. - then no blow |
|
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 330 of Total Fluid 301 of Fluid in Drill Collars 29 of Fluid in Drill Pipe 90 of Slightly oil cut watery mud 5%o 25%w 70%m 120 of Gassy cut muddy water w/film oil 120 of Slightly muddy water 95% water 5% mud 7200 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4765 to 4800
Formation tested: Marmaton | Date, Time: 28-NOV-96; 20:41:29 |
|
Initial Hydro Pressure: 2387 PSI
First Initial Flow Pressure: 32 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 1236 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 34 PSI Final Shut-in Pressure: 1234 PSI Final Hydro Pressure: 2450 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 544 ft. Drill Pipe Length: 4225 ft. |
|
Initial Flow - Strong blow - bottom of bucket in 30 sec. Gas to surface in 15 min. (MCF @ 6.55) Initial Shut-in - Bled off 2"" - no blow back Final Flow - Strong blow - bottom of bucket soon as open tool. (MCF @ 6.72) Initial Shut-in - Bled off 2"" - no blow back |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: yes 1 Gas Recovery: Comments: | |
|
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 15 of 100% Drilling Mud | |
| View Pressures | View Recovery Gas |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5269 to 5323
Formation tested: Morrow | Date, Time: 01-DEC-96; 06:06:14 |
|
Initial Hydro Pressure: 2773 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 41 PSI Initial Shut-in Pressure: 499 PSI Second Initial Flow Pressure: 41 PSI Second Final Flow Pressure: 42 PSI Final Shut-in Pressure: 491 PSI Final Hydro Pressure: 2654 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 544 ft. Drill Pipe Length: 4752 ft. |
|
Initial Flow - Fair blow - built to bottom of bucket in 22 min. Initial Shut-in - Bled off 2"" - no blow back Final Flow - Strong blow - bottom of bucket soon as open tool Final Shut-in - No blow back |
|
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 4575 of Gas in drilling pipe 60 of 100% Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 5331 to 5355
Formation tested: Morrow | Date, Time: 01-DEC-96; 23:05:34 |
|
Initial Hydro Pressure: 2723 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 45 PSI Second Initial Flow Pressure: 20 PSI Second Final Flow Pressure: 22 PSI Final Shut-in Pressure: 32 PSI Final Hydro Pressure: 2548 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 544 ft. Drill Pipe Length: 4771 ft. |
|
Initial Flow - Weak surface blow for 15 min. - then no blow Final Flow - Weak surface blow for 10 min. - then no blow |
|
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of 100% Drilling Mud | |
| View Pressures | No Recovery Gas data. |