Drill Stem Tests Database
Specific Well--15-081-21074
API: 15-081-21074
Operator: AMERICAN WARRIOR INC
Field: Victory
Lease: MITCHELL 'B'
Well 3
Location: T30S R33W, Sec. 18, SE NW SE
1638 North, 1635 West, from SE corner
Longitude: -100.96738
Latitude: 37.43585
County: Haskell
Status: GAS
Spud Date: 21-NOV-96
Completion Date: 03-DEC-96
Plugging Date:
Total Depth: 5524
Form. at depth: MISSISSIPPIAN
Elevation: 2967 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4119 to 4174
Formation tested: Lansing ""A""
Date, Time: 27-NOV-96; 04:53:13
Initial Hydro Pressure: 2012 PSI
First Initial Flow Pressure: 31 PSI
First Final Flow Pressure: 163 PSI
Initial Shut-in Pressure: 324 PSI
Second Initial Flow Pressure: 166 PSI
Second Final Flow Pressure: 183 PSI
Final Shut-in Pressure: 324 PSI
Final Hydro Pressure: 1982 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 301 ft.
Drill Pipe Length: 3851 ft.
Initial Flow - Fair blow - built to 6"" Initial Shut-in - Bled off 2"" - no blow back
Final Flow - Weak surface blow for 5 min. - then no blow
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
330 of Total Fluid
301 of Fluid in Drill Collars
29 of Fluid in Drill Pipe
90 of Slightly oil cut watery mud 5%o 25%w 70%m
120 of Gassy cut muddy water w/film oil
120 of Slightly muddy water 95% water 5% mud
7200 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4765 to 4800
Formation tested: Marmaton
Date, Time: 28-NOV-96; 20:41:29
Initial Hydro Pressure: 2387 PSI
First Initial Flow Pressure: 32 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 1236 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 34 PSI
Final Shut-in Pressure: 1234 PSI
Final Hydro Pressure: 2450 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 4225 ft.
Initial Flow - Strong blow - bottom of bucket in 30 sec. Gas to surface in 15 min. (MCF @ 6.55) Initial Shut-in - Bled off 2"" - no blow back
Final Flow - Strong blow - bottom of bucket soon as open tool. (MCF @ 6.72) Initial Shut-in - Bled off 2"" - no blow back
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples: yes 1
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
15 of 100% Drilling Mud
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5269 to 5323
Formation tested: Morrow
Date, Time: 01-DEC-96; 06:06:14
Initial Hydro Pressure: 2773 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 499 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 42 PSI
Final Shut-in Pressure: 491 PSI
Final Hydro Pressure: 2654 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 4752 ft.
Initial Flow - Fair blow - built to bottom of bucket in 22 min. Initial Shut-in - Bled off 2"" - no blow back
Final Flow - Strong blow - bottom of bucket soon as open tool
Final Shut-in - No blow back
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
4575 of Gas in drilling pipe
60 of 100% Drilling mud
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5331 to 5355
Formation tested: Morrow
Date, Time: 01-DEC-96; 23:05:34
Initial Hydro Pressure: 2723 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 45 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 32 PSI
Final Hydro Pressure: 2548 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 4771 ft.
Initial Flow - Weak surface blow for 15 min. - then no blow
Final Flow - Weak surface blow for 10 min. - then no blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of 100% Drilling Mud
View Pressures No Recovery Gas data.