API: 15-081-21075
Operator: AMERICAN WARRIOR Field: Eubank Northeast Lease: LAIRD 'A' Well 2 |
Location: T28S R33W, Sec. 30, W2 W2 NW
1255 South, 308 East, from NW corner Longitude: -100.9793498 Latitude: 37.5878038 County: Haskell Status: OIL-P&A |
Spud Date: 05-DEC-96
Completion Date: 20-JAN-97 Plugging Date: 15-NOV-13 Total Depth: 5617 Form. at depth: MISSISSIPPIAN Elevation: 2985 KB |
Only DST 2 received. |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4157 to 4190
Formation tested: Lansing | Date, Time: 11-DEC-96; 01:33:47 |
Initial Hydro Pressure: 1975 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 221 PSI Initial Shut-in Pressure: 898 PSI Second Initial Flow Pressure: 225 PSI Second Final Flow Pressure: 325 PSI Final Shut-in Pressure: 894 PSI Final Hydro Pressure: 1953 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 306 ft. Drill Pipe Length: 3843 ft. |
Initial Flow - Fair to strong blow - bottom of bucket in 26 min. Initial Shut-in - No blow Final Flow - Fair to strong blow - bottom of bucket in 30 min. Final Shut-in - No blow |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
Recovery 605 of Total Fluid 306 of Fluid in Drill Collars 299 of Fluid in Drill Pipe 50 of Slightly oil cut muddy water 3%o 85%w 12%m 185 of Muddy water with oil specs 90%w 10%m 370 of Salt Water with oil specs. 32000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5193 to 5264
Formation tested: Morrow | Date, Time: 14-DEC-96; 13:32:43 |
Initial Hydro Pressure: 2653 PSI
First Initial Flow Pressure: 238 PSI First Final Flow Pressure: 343 PSI Initial Shut-in Pressure: 809 PSI Second Initial Flow Pressure: 196 PSI Second Final Flow Pressure: 248 PSI Final Shut-in Pressure: 587 PSI Final Hydro Pressure: 2503 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 275 ft. Drill Pipe Length: 4902 ft. |
Initial Flow - Strong blow - bottom of bucket 1 minute Initial Shut-in - Gas to surface in 15 minutes Final Flow - Strong blow - Bottom of bucket in 1 minute {Gauged @3,000 MCF} |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Yes Gas Recovery: Comments: | |
Recovery 775 of Total Fluid 275 of Fluid in Drill Collars 500 of Fluid in Drill Pipe 712 of Clean Gassy Oil 40%gas 60%oil 63 of Heavy oil & gas cut mud 33.9 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |