Drill Stem Tests Database
Specific Well--15-081-21106
API: 15-081-21106
Operator: Amoco Production Co.
Field: Victory
Lease: Grant Maurice
Well 1-30
Location: T30S R33W, Sec. 30, SW SW
660 North, 660 East, from SW corner
Longitude: -100.9774761
Latitude: 37.4041106
County: Haskell
Status: D&A
Spud Date: 06-MAR-97
Completion Date: 12-JUN-97
Plugging Date: 12-JUN-97
Total Depth: 5482
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 2967 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4100 to 4125
Formation tested: Lansing A
Date, Time: 12-MAR-97; 17:26:50
Initial Hydro Pressure: 1926 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 42 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 37 PSI
Final Shut-in Pressure: 51 PSI
Final Hydro Pressure: 1917 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 87 ft.
Drill Pipe Length: 4005 ft.
Initial Flow: Weak surface blow Initial Shut In:
Final Flow: Weak surface blow
Final Shut In:
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of 100% Drilling Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4150 to 4163
Formation tested: Lansing B
Date, Time: 13-MAR-97; 23:31:10
Initial Hydro Pressure: 2016 PSI
First Initial Flow Pressure: 49 PSI
First Final Flow Pressure: 123 PSI
Initial Shut-in Pressure: 889 PSI
Second Initial Flow Pressure: 135 PSI
Second Final Flow Pressure: 214 PSI
Final Shut-in Pressure: 884 PSI
Final Hydro Pressure: 1943 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 87 ft.
Drill Pipe Length: 4037 ft.
Initial Flow: Strong blow, bottom of bucket in 30sec Initial Shut In: Bled off 2"", had surface blow back. Fianl Flow: Strong blow, bottom of bucket in 8 min
Final Shut In: Bled off 2"", had surface blow back
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
460 of Total Fluid
87 of Fluid in Drill Collars
373 of Fluid in Drill Pipe
100 of Frothy Oil Watery Mud
120 of Slightly Muddy Water
240 of 100% Water
65000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4565 to 4610
Formation tested: Kansas City ""A""
Date, Time: 16-MAR-97; 00:24:07
Initial Hydro Pressure: 1320 PSI
First Initial Flow Pressure: 39 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 604 PSI
Second Initial Flow Pressure: 35 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 586 PSI
Final Hydro Pressure: 1272 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 87 ft.
Drill Pipe Length: 4474 ft.
Initial Flow: Strong blow, bottom of bucket in 15sec Gas To Surface in 10 min MCF @ 44002
Final Flow Strong blow, bottom of bucket as soon as tool opened MCF @ 48008
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples: yes 1
Gas Recovery:
Comments:
Recovery
140 of Total Fluid
87 of Fluid in Drill Collars
53 of Fluid in Drill Pipe
140 of Drilling Mud 100%
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 5070 to 5150
Formation tested: Atoka
Date, Time: 18-MAR-97; 01:22:57
Initial Hydro Pressure: 2444 PSI
First Initial Flow Pressure: 70 PSI
First Final Flow Pressure: 133 PSI
Initial Shut-in Pressure: 364 PSI
Second Initial Flow Pressure: 142 PSI
Second Final Flow Pressure: 269 PSI
Final Shut-in Pressure: 362 PSI
Final Hydro Pressure: 2352 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 87 ft.
Drill Pipe Length: 4972 ft.
Initial Flow: Strong blow, bottom of bucket in 30sec Gas to Surface in 26 mins, to small to measure Initial Shut In: Weak to fair blow, 1-4""
Final Flow: Strong blow, see gas volume report
Final Shut In: Fair blow, 2-9""
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 12
Samples: gas sample
Gas Recovery:
Comments:
Recovery
545 of Total Fluid
87 of Fluid in Drill Collars
458 of Fluid in Drill Pipe
85 of Gassy Mud with Oil Specs
125 of Slight Oil and Gas Cut Watery Mud
185 of Slight Oil Cut Muddy Water
150 of Muddy Water with Oil Specs
33000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 7 Data Source: TRILOBITE
Interval: 5240 to 5370
Formation tested: Morrow
Date, Time: 20-MAR-97; 03:35:31
Initial Hydro Pressure: 2614 PSI
First Initial Flow Pressure: 960 PSI
First Final Flow Pressure: 351 PSI
Initial Shut-in Pressure: 870 PSI
Second Initial Flow Pressure: 393 PSI
Second Final Flow Pressure: 738 PSI
Final Shut-in Pressure: 912 PSI
Final Hydro Pressure: 2535 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 89 ft.
Drill Pipe Length: 4972 ft.
Initial Flow: Strong blow, bottom of bucket in 15sec Gas to Surface in 3 min Initial Shut In: Blow built to 7""
Final Flow: Strong blow, See gas volume report Fianl Shut In: Strong blow, built to bottom of bucket
Bottom Hole Temperature: 132 DEG F
Percent Porosity:
Samples: gas sample
Gas Recovery:
Comments:
Recovery
2060 of Total Fluid
89 of Fluid in Drill Collars
1971 of Fluid in Drill Pipe
200 of Mud Cut Oil 30% oil 70% mud
1860 of Clean Gassy Oil
36 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.