API: 15-081-21106
Operator: Amoco Production Co. Field: Victory Lease: Grant Maurice Well 1-30 |
Location: T30S R33W, Sec. 30, SW SW
660 North, 660 East, from SW corner Longitude: -100.9774761 Latitude: 37.4041106 County: Haskell Status: D&A |
Spud Date: 06-MAR-97
Completion Date: 12-JUN-97 Plugging Date: 12-JUN-97 Total Depth: 5482 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2967 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4100 to 4125
Formation tested: Lansing A | Date, Time: 12-MAR-97; 17:26:50 |
Initial Hydro Pressure: 1926 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 42 PSI Second Initial Flow Pressure: 31 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 51 PSI Final Hydro Pressure: 1917 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 87 ft. Drill Pipe Length: 4005 ft. |
Initial Flow: Weak surface blow Initial Shut In: Final Flow: Weak surface blow Final Shut In: |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of 100% Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4150 to 4163
Formation tested: Lansing B | Date, Time: 13-MAR-97; 23:31:10 |
Initial Hydro Pressure: 2016 PSI
First Initial Flow Pressure: 49 PSI First Final Flow Pressure: 123 PSI Initial Shut-in Pressure: 889 PSI Second Initial Flow Pressure: 135 PSI Second Final Flow Pressure: 214 PSI Final Shut-in Pressure: 884 PSI Final Hydro Pressure: 1943 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 87 ft. Drill Pipe Length: 4037 ft. |
Initial Flow: Strong blow, bottom of bucket in 30sec Initial Shut In: Bled off 2"", had surface blow back. Fianl Flow: Strong blow, bottom of bucket in 8 min Final Shut In: Bled off 2"", had surface blow back |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
Recovery 460 of Total Fluid 87 of Fluid in Drill Collars 373 of Fluid in Drill Pipe 100 of Frothy Oil Watery Mud 120 of Slightly Muddy Water 240 of 100% Water 65000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4565 to 4610
Formation tested: Kansas City ""A"" | Date, Time: 16-MAR-97; 00:24:07 |
Initial Hydro Pressure: 1320 PSI
First Initial Flow Pressure: 39 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 604 PSI Second Initial Flow Pressure: 35 PSI Second Final Flow Pressure: 45 PSI Final Shut-in Pressure: 586 PSI Final Hydro Pressure: 1272 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 87 ft. Drill Pipe Length: 4474 ft. |
Initial Flow: Strong blow, bottom of bucket in 15sec Gas To Surface in 10 min MCF @ 44002 Final Flow Strong blow, bottom of bucket as soon as tool opened MCF @ 48008 |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: yes 1 Gas Recovery: Comments: | |
Recovery 140 of Total Fluid 87 of Fluid in Drill Collars 53 of Fluid in Drill Pipe 140 of Drilling Mud 100% | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 5070 to 5150
Formation tested: Atoka | Date, Time: 18-MAR-97; 01:22:57 |
Initial Hydro Pressure: 2444 PSI
First Initial Flow Pressure: 70 PSI First Final Flow Pressure: 133 PSI Initial Shut-in Pressure: 364 PSI Second Initial Flow Pressure: 142 PSI Second Final Flow Pressure: 269 PSI Final Shut-in Pressure: 362 PSI Final Hydro Pressure: 2352 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 87 ft. Drill Pipe Length: 4972 ft. |
Initial Flow: Strong blow, bottom of bucket in 30sec Gas to Surface in 26 mins, to small to measure Initial Shut In: Weak to fair blow, 1-4"" Final Flow: Strong blow, see gas volume report Final Shut In: Fair blow, 2-9"" |
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 12 Samples: gas sample Gas Recovery: Comments: | |
Recovery 545 of Total Fluid 87 of Fluid in Drill Collars 458 of Fluid in Drill Pipe 85 of Gassy Mud with Oil Specs 125 of Slight Oil and Gas Cut Watery Mud 185 of Slight Oil Cut Muddy Water 150 of Muddy Water with Oil Specs 33000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 7 | Data Source: TRILOBITE |
Interval: 5240 to 5370
Formation tested: Morrow | Date, Time: 20-MAR-97; 03:35:31 |
Initial Hydro Pressure: 2614 PSI
First Initial Flow Pressure: 960 PSI First Final Flow Pressure: 351 PSI Initial Shut-in Pressure: 870 PSI Second Initial Flow Pressure: 393 PSI Second Final Flow Pressure: 738 PSI Final Shut-in Pressure: 912 PSI Final Hydro Pressure: 2535 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 89 ft. Drill Pipe Length: 4972 ft. |
Initial Flow: Strong blow, bottom of bucket in 15sec Gas to Surface in 3 min Initial Shut In: Blow built to 7"" Final Flow: Strong blow, See gas volume report Fianl Shut In: Strong blow, built to bottom of bucket |
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: Samples: gas sample Gas Recovery: Comments: | |
Recovery 2060 of Total Fluid 89 of Fluid in Drill Collars 1971 of Fluid in Drill Pipe 200 of Mud Cut Oil 30% oil 70% mud 1860 of Clean Gassy Oil 36 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |