|
API: 15-081-21116
Operator: Anadarko Petroleum Corp. Field: Eubank Lease: CLAWSON 'B' Well 1 |
Location: T29S R34W, Sec. 9, N2 N2 SE SW
1090 North, 1980 East, from SW corner Longitude: -101.0464385 Latitude: 37.5359733 County: Haskell Status: GAS |
Spud Date: 11/05/1997
Completion Date: 11/26/1997 Plugging Date: Total Depth: 5600 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2998 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4736 to 4777
Formation tested: pawnee | Date, Time: 11/13/1997; 04:55:28 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4015 ft. |
| Ran tool to 3960' sticky hole pull tool | |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4743 to 4784
Formation tested: Pawnee | Date, Time: 11/14/1997; 21:49:10 |
|
Initial Hydro Pressure: 2346 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: 1007 PSI Final Hydro Pressure: 2235 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4856 ft. |
|
Initial Flow: Bottom of buckt in 1 1/2 minutes Final Shutin: no return |
|
|
Bottom Hole Temperature: 107 DEG F
Percent Porosity: Samples: gas Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of Drilling mud 100% mud 3700 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |