Drill Stem Tests Database
Specific Well--15-081-21142
API: 15-081-21142
Operator: Berexco, Inc.
Field: Cutter
Lease: Sara
Well 1-28
Location: T30S R34W, Sec. 28, E2 SW SE SE
204 North, 811 West, from SE corner
Longitude: -101.0371221
Latitude: 37.4030231
County: Haskell
Status: OIL-P&A
Spud Date: 01-AUG-97
Completion Date: 01-OCT-97
Plugging Date: 08-DEC-22
Total Depth: 5798
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 2910 KB

Download DST Test Data

Test Number: 3 Data Source: TRILOBITE
Interval: 5656 to 5670
Formation tested: Chester
Date, Time: 14-AUG-97; 11:12:43
Initial Hydro Pressure: 2832 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 60 PSI
Initial Shut-in Pressure: 1510 PSI
Second Initial Flow Pressure: 70 PSI
Second Final Flow Pressure: 174 PSI
Final Shut-in Pressure: 1554 PSI
Final Hydro Pressure: 2584 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 620 ft.
Drill Pipe Length: 5037 ft.
Initial Flow: Bottom of bucket in 2 min Initial Shut In: Weak return in 10 mins built to 1""
Final Flow: Bottom of bucket in 1 min
Final Shut In: Return in 1 min, built to 9"", Gas to surface 6 min into shut in
Bottom Hole Temperature: 146 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
440 of Total Fluid
440 of Fluid in Drill Collars
180 of Clean Gassy Oil 60%gas 40%oil
90 of Gassy Oil Cut Mud 60%gas 20%oil 20%mud
90 of Gassy Oil Cut Muddy Water
80 of Slightly Gassy Water
59000 of Salinity (PPM)
41 of Gravity (API)
View Pressures No Recovery Gas data.