|
API: 15-081-21142
Operator: Berexco, Inc. Field: Cutter Lease: Sara Well 1-28 |
Location: T30S R34W, Sec. 28, E2 SW SE SE
204 North, 811 West, from SE corner Longitude: -101.0371221 Latitude: 37.4030231 County: Haskell Status: OIL-P&A |
Spud Date: 01-AUG-97
Completion Date: 01-OCT-97 Plugging Date: 08-DEC-22 Total Depth: 5798 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2910 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5656 to 5670
Formation tested: Chester | Date, Time: 14-AUG-97; 11:12:43 |
|
Initial Hydro Pressure: 2832 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 60 PSI Initial Shut-in Pressure: 1510 PSI Second Initial Flow Pressure: 70 PSI Second Final Flow Pressure: 174 PSI Final Shut-in Pressure: 1554 PSI Final Hydro Pressure: 2584 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 620 ft. Drill Pipe Length: 5037 ft. |
|
Initial Flow: Bottom of bucket in 2 min Initial Shut In: Weak return in 10 mins built to 1"" Final Flow: Bottom of bucket in 1 min Final Shut In: Return in 1 min, built to 9"", Gas to surface 6 min into shut in |
|
|
Bottom Hole Temperature: 146 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 440 of Total Fluid 440 of Fluid in Drill Collars 180 of Clean Gassy Oil 60%gas 40%oil 90 of Gassy Oil Cut Mud 60%gas 20%oil 20%mud 90 of Gassy Oil Cut Muddy Water 80 of Slightly Gassy Water 59000 of Salinity (PPM) 41 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |