Drill Stem Tests Database
Specific Well--15-081-21155
API: 15-081-21155
Operator: Berexco, Inc.
Field: Victory
Lease: Withers
Well 1-36
Location: T29S R34W, Sec. 36, NE SW
1980 North, 3300 West, from SE corner
Longitude: -100.9911529
Latitude: 37.4804749
County: Haskell
Status: O&G
Spud Date: 12-NOV-97
Completion Date: 27-JAN-98
Plugging Date:
Total Depth: 5600
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 2979 KB
Test Number: 5 Data Source: TRILOBITE
Interval: 5267 to 5292
Formation tested: Morrow Lime Shale
Date, Time: 24-NOV-97; 03:41:41
Initial Hydro Pressure: 2643 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 58 PSI
Initial Shut-in Pressure: 1620 PSI
Second Initial Flow Pressure: 48 PSI
Second Final Flow Pressure: 116 PSI
Final Shut-in Pressure: 1502 PSI
Final Hydro Pressure: 2523 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 173 ft.
Drill Pipe Length: 5141 ft.
Initial Flow: Strong Blow; GTS in 30min Bottom of bucket in 2 min. Initial Shutin: bled off 2 in., had 4 in. blow back.
Final Flow: Strong blow; bottom of bucket as soon as open tool MCF @ 14.1
Final Shutin: bled off 2 in., had 5 in. blow back.
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples: YES 1
Gas Recovery:
Comments:
Recovery
325 of Total Fluid
173 of Fluid in Drill Collars
152 of Fluid in Drill Pipe
60 of Clean gassy oil 50%gas 50%oil
92 of Clean gassy slight mud cut oil
173 of Gas & mud cut oil 75%gas 15%oil 10%mud
37.7 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 5354 to 5420
Formation tested: Morrow Sand
Date, Time: 25-NOV-97; 15:50:20
Initial Hydro Pressure: 2737 PSI
First Initial Flow Pressure: 125 PSI
First Final Flow Pressure: 140 PSI
Initial Shut-in Pressure: 1517 PSI
Second Initial Flow Pressure: 127 PSI
Second Final Flow Pressure: 133 PSI
Final Shut-in Pressure: 1517 PSI
Final Hydro Pressure: 2646 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 173 ft.
Drill Pipe Length: 5214 ft.
Initial Flow: Strong blow, bottom of bucket in 30 seconds. Gas to surface in 8 minutes. {MCF@ 652} Initial Shutin: No blow.
Final Flow: Strong blow, bottom of bucket as soon as tool opened. {MCF@ 749}
Final Shutin: No blow.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: YES 1
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Collars
1 of 100% Drlg Mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.