Drill Stem Tests Database
Specific Well--15-083-21451
API: 15-083-21451
Operator: Slawson Exploration Co., Inc.
Field: Lippoldt Southeast
Lease: Cook 'Z'
Well 1
Location: T23S R22W, Sec. 30, W2 E2 SE NE
1930 South, 518 West, from NE corner
Longitude: -99.7724049
Latitude: 38.0238912
County: Hodgeman
Status: OIL-P&A
Spud Date: 15-SEP-97
Completion Date: 01-NOV-97
Plugging Date: 31-DEC-12
Total Depth: 4698
Form. at depth: MISSISSIPPIAN
Elevation: 2377 KB
geologist report lease name: Cook #1 - dm 10-24-2000. Discovery well for Lippoldt Southeast field.

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4530 to 4611
Formation tested: Mississippi
Date, Time: 22-SEP-97; 14:48:31
Initial Hydro Pressure: 2263 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 49 PSI
Initial Shut-in Pressure: 160 PSI
Second Initial Flow Pressure: 56 PSI
Second Final Flow Pressure: 64 PSI
Final Shut-in Pressure: 131 PSI
Final Hydro Pressure: 2253 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 4354 ft.
Initial Flow: Surface blow built to 1 1/4"" Initial Shut In:
Final Flow: Surface blow 1/4""
Final Shut In: No return
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of Oil Cut Mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4622 to 4638
Formation tested: Mississippi
Date, Time: 23-SEP-97; 15:46:54
Initial Hydro Pressure: 2314 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 1076 PSI
Second Initial Flow Pressure: 49 PSI
Second Final Flow Pressure: 61 PSI
Final Shut-in Pressure: 702 PSI
Final Hydro Pressure: 2233 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 4385 ft.
Initial Flow: Surface blow built to 3/4"" Initial Shutin: No return
Final Flow: Weak 1/4"" blow
Final Shutin: No return
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
40 of Gassy Oil
85 of Oil Cut Mud
View Pressures No Recovery Gas data.