Drill Stem Tests Database
Specific Well--15-083-21452
API: 15-083-21452
Operator: Enerstar Resources, L.C.
Field: Sebes West
Lease: Korf
Well 1
Location: T23S R22W, Sec. 7, SE SW SE
398 North, 1572 West, from SE corner
Longitude: -99.7760651
Latitude: 38.0593698
County: Hodgeman
Status: OIL
Spud Date: 09/27/1997
Completion Date: 11/01/1997
Plugging Date:
Total Depth: 4534
Form. at depth: MISSISSIPPIAN
Elevation: 2269 KB
Discovery well for Sebes West field. Newer op Pintail Petroleum.

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4450 to 4514
Formation tested: Miss
Date, Time: 10/05/1997; 02:26:13
Initial Hydro Pressure: 2214 PSI
First Initial Flow Pressure: 41 PSI
First Final Flow Pressure: 54 PSI
Initial Shut-in Pressure: 1315 PSI
Second Initial Flow Pressure: 57 PSI
Second Final Flow Pressure: 90 PSI
Final Shut-in Pressure: 1335 PSI
Final Hydro Pressure: 2215 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4440 ft.
Initial Blow: Weak building to 2 1/2""
Final Blow: Weak building to 4""
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
124 of Total Fluid
124 of Fluid in Drill Pipe
124 of Gas in pipe
62 of Mud & Gas cut oil 20%gas 50%oil 30%mud
62 of Oil cut mud 30%oil 70%mud
View Pressures No Recovery Gas data.