Drill Stem Tests Database
Specific Well--15-093-21495
API: 15-093-21495
Operator: Lebsack Oil Production, Inc.
Field: Christabelle
Lease: Foster 'D'
Well 1
Location: T21S R35W, Sec. 14, NE NE NE
500 South, 330 West, from NE corner
Longitude: -101.1224946
Latitude: 38.233905
County: Kearny
Status: OIL
Spud Date: 01/24/1996
Completion Date: 02/02/1996
Plugging Date:
Total Depth: 4960
Form. at depth: MISSISSIPPIAN
Elevation: 3106 KB
Discovery well for Christabelle field.

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4890 to 4960
Formation tested: Morrow
Date, Time: 01/31/1996; 11:16:49
Initial Hydro Pressure: 2406 PSI
First Initial Flow Pressure: 40 PSI
First Final Flow Pressure: 130 PSI
Initial Shut-in Pressure: 635 PSI
Second Initial Flow Pressure: 136 PSI
Second Final Flow Pressure: 190 PSI
Final Shut-in Pressure: 635 PSI
Final Hydro Pressure: 2366 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: ft.
Drill Pipe Length: 4628 ft.
Initial Flow - Fair blow built to 5.5"" in bucket
Initial Shutin - Bled off, no blow back
Final Flow - Fair blow, built to 6.5"" in bucket
Final Shutin - Bled off, blew back in 1 min, died after 18 min
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
473 of Total Fluid
473 of Fluid in Drill Pipe
3 of Free Oil- 100% oil
350 of Oil cut watery mud-2% oil, 40% water, 58% mud
120 of Oil & mud cut water-1% oil, 90% water, 9% mud
19000 of Salinity (PPM)
27.1 of Gravity (API)
View Pressures No Recovery Gas data.