|
API: 15-093-21583
Operator: Pennzoil Exploration and Production Co. Field: Hugoton Gas Area Lease: Coy Well 2 |
Location: T22S R35W, Sec. 26, N2 SE SW
1250 North, 2000 East, from SW corner Longitude: -101.1318792 Latitude: 38.1082222 County: Kearny Status: GAS |
Spud Date: 18-JUN-97
Completion Date: 29-JUN-97 Plugging Date: Total Depth: 5000 Form. at depth: MISSISSIPPIAN Elevation: 3029 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4081 to 4127
Formation tested: KC ""I"" | Date, Time: 24-JUN-97; 12:55:30 |
|
Initial Hydro Pressure: 1960 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 179 PSI Initial Shut-in Pressure: 1061 PSI Second Initial Flow Pressure: 181 PSI Second Final Flow Pressure: 571 PSI Final Shut-in Pressure: 1069 PSI Final Hydro Pressure: 1934 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 3822 ft. |
|
Initial Flow: Bottom of bucket in 9 minutes Initial Shutin: Bled off blow for 1/2 minute no return Final Flow: Bottom of bucket in 12 minutes Final Shutin: Bled off blow for 1/2 minute no return |
|
|
Bottom Hole Temperature: 98 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1312 of Total Fluid 1312 of Fluid in Drill Pipe 50 of Free oil 100% oil 180 of Oil & mud cut water 276 of Oil & mud cut water 400 of Slightly oil & mud cut water 406 of Salt water 100% water - oil scum 49000 of Salinity (PPM) 22 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4442 to 4460
Formation tested: Pawnee | Date, Time: 26-JUN-97; 02:47:51 |
|
Initial Hydro Pressure: 2152 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 17 PSI Initial Shut-in Pressure: 1055 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 22 PSI Final Shut-in Pressure: 1180 PSI Final Hydro Pressure: 2109 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4136 ft. |
|
Initial Flow: Weak surface blow died in 13 min Initial Shutin: No return Final Flow: Bubble to open tool - no blow Final Shutin: No return |
|
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5 of Drilling Mud with oil scum 3100 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4642 to 4682
Formation tested: Atoka | Date, Time: 27-JUN-97; 11:33:18 |
|
Initial Hydro Pressure: 2259 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 21 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 19 PSI Final Shut-in Pressure: 23 PSI Final Hydro Pressure: 2218 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4353 ft. |
|
Initial flow- Weak blow died in 3 minutes Final flow- Bubble to open tool--no blow |
|
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1 of Total Fluid 1 of Fluid in Drill Pipe 1 of Drilling Mud 3100 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4780 to 4855
Formation tested: Morrow | Date, Time: 28-JUN-97; 13:28:30 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4508 ft. |
| Initial Flow: Packer failure at open, treid to reset - pull tool | |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 200 of Total Fluid 200 of Fluid in Drill Pipe 200 of Drilling Mud 4700 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4680 to 4855
Formation tested: Morrow | Date, Time: 28-JUN-97; 19:10:34 |
|
Initial Hydro Pressure: 2294 PSI
First Initial Flow Pressure: 42 PSI First Final Flow Pressure: 47 PSI Initial Shut-in Pressure: 423 PSI Second Initial Flow Pressure: 49 PSI Second Final Flow Pressure: 52 PSI Final Shut-in Pressure: 736 PSI Final Hydro Pressure: 2236 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4569 ft. |
|
Initial Flow: 2"" blow at open, died back to 1/2"" Initial Shut In: Bled off blow - no return Final Flow: No blow Final Shut In: No return |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 40 of Drilling Mud 4800 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |