Drill Stem Tests Database
Specific Well--15-093-21583
API: 15-093-21583
Operator: Pennzoil Exploration and Production Co.
Field: Hugoton Gas Area
Lease: Coy
Well 2
Location: T22S R35W, Sec. 26, N2 SE SW
1250 North, 2000 East, from SW corner
Longitude: -101.1318792
Latitude: 38.1082222
County: Kearny
Status: GAS
Spud Date: 18-JUN-97
Completion Date: 29-JUN-97
Plugging Date:
Total Depth: 5000
Form. at depth: MISSISSIPPIAN
Elevation: 3029 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4081 to 4127
Formation tested: KC ""I""
Date, Time: 24-JUN-97; 12:55:30
Initial Hydro Pressure: 1960 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 179 PSI
Initial Shut-in Pressure: 1061 PSI
Second Initial Flow Pressure: 181 PSI
Second Final Flow Pressure: 571 PSI
Final Shut-in Pressure: 1069 PSI
Final Hydro Pressure: 1934 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 3822 ft.
Initial Flow: Bottom of bucket in 9 minutes Initial Shutin: Bled off blow for 1/2 minute no return
Final Flow: Bottom of bucket in 12 minutes
Final Shutin: Bled off blow for 1/2 minute no return
Bottom Hole Temperature: 98 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1312 of Total Fluid
1312 of Fluid in Drill Pipe
50 of Free oil 100% oil
180 of Oil & mud cut water
276 of Oil & mud cut water
400 of Slightly oil & mud cut water
406 of Salt water 100% water - oil scum
49000 of Salinity (PPM)
22 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4442 to 4460
Formation tested: Pawnee
Date, Time: 26-JUN-97; 02:47:51
Initial Hydro Pressure: 2152 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 17 PSI
Initial Shut-in Pressure: 1055 PSI
Second Initial Flow Pressure: 18 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 1180 PSI
Final Hydro Pressure: 2109 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4136 ft.
Initial Flow: Weak surface blow died in 13 min Initial Shutin: No return
Final Flow: Bubble to open tool - no blow
Final Shutin: No return
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Pipe
5 of Drilling Mud with oil scum
3100 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4642 to 4682
Formation tested: Atoka
Date, Time: 27-JUN-97; 11:33:18
Initial Hydro Pressure: 2259 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 18 PSI
Initial Shut-in Pressure: 21 PSI
Second Initial Flow Pressure: 18 PSI
Second Final Flow Pressure: 19 PSI
Final Shut-in Pressure: 23 PSI
Final Hydro Pressure: 2218 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4353 ft.
Initial flow- Weak blow died in 3 minutes
Final flow- Bubble to open tool--no blow
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Pipe
1 of Drilling Mud
3100 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4780 to 4855
Formation tested: Morrow
Date, Time: 28-JUN-97; 13:28:30
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4508 ft.
Initial Flow: Packer failure at open, treid to reset - pull tool
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Pipe
200 of Drilling Mud
4700 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4680 to 4855
Formation tested: Morrow
Date, Time: 28-JUN-97; 19:10:34
Initial Hydro Pressure: 2294 PSI
First Initial Flow Pressure: 42 PSI
First Final Flow Pressure: 47 PSI
Initial Shut-in Pressure: 423 PSI
Second Initial Flow Pressure: 49 PSI
Second Final Flow Pressure: 52 PSI
Final Shut-in Pressure: 736 PSI
Final Hydro Pressure: 2236 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4569 ft.
Initial Flow: 2"" blow at open, died back to 1/2"" Initial Shut In: Bled off blow - no return
Final Flow: No blow
Final Shut In: No return
Bottom Hole Temperature: 113 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
40 of Total Fluid
40 of Fluid in Drill Pipe
40 of Drilling Mud
4800 of Salinity (PPM)
View Pressures No Recovery Gas data.