Drill Stem Tests Database
Specific Well--15-097-21403
API: 15-097-21403
Operator: CROSS BAR PET
Field: Hardy
Lease: MARTIN
Well 1-23
Location: T28S R18W, Sec. 23, NW NW NW SE
2331 North, 2345 West, from SE corner
Longitude: -99.2565269
Latitude: 37.5931905
County: Kiowa
Status: GAS-P&A
Spud Date: 21-JAN-96
Completion Date: 08-MAR-96
Plugging Date: 03-JAN-18
Total Depth: 5000
Form. at depth: KINDERHOOKIAN
Elevation: 2240 KB
Test Number: 6 Data Source: TRILOBITE
Interval: 4782 to 4860
Formation tested: Mississippi
Date, Time: 31-JAN-96; 01:37:49
Initial Hydro Pressure: 2301 PSI
First Initial Flow Pressure: 78 PSI
First Final Flow Pressure: 78 PSI
Initial Shut-in Pressure: 1058 PSI
Second Initial Flow Pressure: 100 PSI
Second Final Flow Pressure: 124 PSI
Final Shut-in Pressure: 1089 PSI
Final Hydro Pressure: 2232 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 184 ft.
Drill Pipe Length: 4581 ft.
Initial Flow - Strong blow, bottom of bucket in 5 sec Gas to surface in 5 min
Final Flow - Strong blow
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 10
Samples: GAS SAMPLE
Gas Recovery:
Comments:
Recovery
256 of Total Fluid
184 of Fluid in Drill Collars
72 of Fluid in Drill Pipe
134 of Gassy mud w/ oil specks - 10% gas, 90% mud
122 of Gassy oil cut mud - 25% gas, 7% oil, 68% mud
20 of Pay (est)
7000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.