Drill Stem Tests Database
Specific Well--15-097-21422
API: 15-097-21422
Operator: CROSS BAR PETROLEUM, INC.
Field: Barstow
Lease: Jantz
Well 2-28
Location: T29S R17W, Sec. 28, E2 NW SE
1980 North, 1650 West, from SE corner
Longitude: -99.181498
Latitude: 37.4896341
County: Kiowa
Status: D&A
Spud Date: 25-FEB-97
Completion Date: 07-MAR-97
Plugging Date: 25-MAR-97
Total Depth: 5000
Form. at depth: MISSISSIPPIAN
Elevation: 2157 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 2958 to 2995
Formation tested: Cottonwood
Date, Time: 28-FEB-97; 12:47:39
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 547 ft.
Drill Pipe Length: 2400 ft.
IF: ISI: FF: FSI:
Bottom Hole Temperature: DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 2958 to 2995
Formation tested: Cottonwood
Date, Time: 28-FEB-97; 19:16:36
Initial Hydro Pressure: 1510 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 113 PSI
Initial Shut-in Pressure: 159 PSI
Second Initial Flow Pressure: 111 PSI
Second Final Flow Pressure: 134 PSI
Final Shut-in Pressure: 157 PSI
Final Hydro Pressure: 1446 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 547 ft.
Drill Pipe Length: 2400 ft.
IF:Weak to fair blow. (slow increase to 9 "" in H20) ISI:No blow FF:Weak blow. (1/2 - 2 "" in H20) FSI:No blow
Bottom Hole Temperature: 84 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4800 to 4900
Formation tested: Mississippi
Date, Time: 05-MAR-97; 10:13:04
Initial Hydro Pressure: 2340 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 37 PSI
Initial Shut-in Pressure: 166 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 44 PSI
Final Shut-in Pressure: 225 PSI
Final Hydro Pressure: 2335 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 547 ft.
Drill Pipe Length: 4247 ft.
Initial Shut In: Fair to strong blow, bottom of bucket in 16 mins Initital Shut In: Weak blow, (1/4"")
Final Flow: Fair To strong blow, bottom of bucket
Final Shut In: Weak blow, (1/4"")
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
490 of Gas in pipe.
60 of Drilling Mud
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4900 to 4920
Formation tested: Mississippi
Date, Time: 06-MAR-97; 02:46:13
Initial Hydro Pressure: 2416 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 28 PSI
Initial Shut-in Pressure: 1013 PSI
Second Initial Flow Pressure: 29 PSI
Second Final Flow Pressure: 40 PSI
Final Shut-in Pressure: 788 PSI
Final Hydro Pressure: 2377 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 547 ft.
Drill Pipe Length: 4342 ft.
Initial Flow: Weak blow, (1/2 to 3"" in water) Initial Shut In:
Final Flow: Weak blow. (1/2 - 2"")
Final Shut In:
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
140 of Gas in pipe.
20 of Drilling Mud with Oil specs.
9000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.