Drill Stem Tests Database
Specific Well--15-097-21423
API: 15-097-21423
Operator: Cross Bar Petroleum, Inc.
Field: Hardy
Lease: Yohn
Well 1-17
Location: T28S R17W, Sec. 17, NW NW
510 South, 510 East, from NW corner
Longitude: -99.2108685
Latitude: 37.6147624
County: Kiowa
Status: GAS
Spud Date: 07-MAY-97
Completion Date: 17-MAY-97
Plugging Date:
Total Depth: 4880
Form. at depth: KINDERHOOKIAN
Elevation: 2192 KB
Test Number: 3 Data Source: TRILOBITE
Interval: 4650 to 4690
Formation tested: Pawnee
Date, Time: 14-MAY-97; 15:31:18
Initial Hydro Pressure: 2279 PSI
First Initial Flow Pressure: 81 PSI
First Final Flow Pressure: 85 PSI
Initial Shut-in Pressure: 1596 PSI
Second Initial Flow Pressure: 75 PSI
Second Final Flow Pressure: 85 PSI
Final Shut-in Pressure: 1597 PSI
Final Hydro Pressure: 2247 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 545 ft.
Drill Pipe Length: 4094 ft.
Initial Flow: Strong blow, bottom of bucket in 10sec Gas to Surface in 6 mins (See Gas Volume Report Initial Shut In: Fair to strong blow
Final Flow: Strong blow (see gas volume report)
Final Shut In: Strong blow
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 14
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Collars
130 of Gas Cut Mud
8000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4742 to 4780
Formation tested: Mississippi
Date, Time: 15-MAY-97; 11:47:28
Initial Hydro Pressure: 2327 PSI
First Initial Flow Pressure: 38 PSI
First Final Flow Pressure: 50 PSI
Initial Shut-in Pressure: 1303 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 47 PSI
Final Shut-in Pressure: 1366 PSI
Final Hydro Pressure: 2279 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 545 ft.
Drill Pipe Length: 4184 ft.
Initial Flow: Strong blow, bottom of bucket in 20sec Gas to Surface in 18 minutes See gas volume report Initial Shut In: Fair to strong blow
Final Flow: Strong blow, see gas volume report
Final Shut In: Fair to strong blow
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
85 of Total Fluid
85 of Fluid in Drill Collars
85 of Heavy Mud
11000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: Data Source: TRILOBITE
Interval: to
Formation tested:
Date, Time: 16-MAY-97; 05:03:05
  Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.