|
API: 15-101-21722
Operator: Hess Oil Co. Field: Broughton Northeast Lease: E and J Well 1 |
Location: T16S R27W, Sec. 11, SE SE SW
330 North, 2310 East, from SW corner Longitude: -100.2758289 Latitude: 38.6695402 County: Lane Status: D&A |
Spud Date: 07/19/1996
Completion Date: 07/26/1996 Plugging Date: 07/26/1996 Total Depth: 4502 Form. at depth: MISSISSIPPIAN Elevation: 2572 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4432 to 4462
Formation tested: CHEROKEE | Date, Time: 07/25/1996; 05:48:54 |
|
Initial Hydro Pressure: 2230 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 1034 PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2158 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 4169 ft. |
|
Initial Flow - Weak .25"" blow died in 23 minutes Final Flow - No open, tool out of hole with company orders |
|
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4432 to 4485
Formation tested: MISSISSIPPIAN | Date, Time: 07/25/1996; 15:48:24 |
|
Initial Hydro Pressure: 2169 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 36 PSI Initial Shut-in Pressure: 1061 PSI Second Initial Flow Pressure: 31 PSI Second Final Flow Pressure: 43 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2132 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 4168 ft. |
|
Initial Flow - .25"" - .5"" intermittent blow throughout Initial Shutin - No blow Final Flow - Surge blow at open, no return, out of hole with tool |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling mud w/ few specks of oil in tool | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4488 to 4502
Formation tested: MISSISSIPPIAN | Date, Time: 07/26/1996; 02:23:41 |
|
Initial Hydro Pressure: 2320 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 144 PSI Initial Shut-in Pressure: 1155 PSI Second Initial Flow Pressure: 150 PSI Second Final Flow Pressure: 197 PSI Final Shut-in Pressure: 1096 PSI Final Hydro Pressure: 2154 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 4230 ft. |
|
Initial Flow - Weak surface blow slowly built to 8"" Initial Shutin - No return blow Final Flow - Surface return slowly built to 4"" Final Shutin - Weak surface return died in 20 min |
|
|
Bottom Hole Temperature: 135 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 440 of Total Fluid 248 of Fluid in Drill Collars 192 of Fluid in Drill Pipe 140 of Gas in pipe 140 of Gassy mud & water cut oil - 60 of Slightly gassy oil cut watery mud - 240 of Muddy water w/ trace oil - 75% water, 25% mud 12000 of Salinity (PPM) 35 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |