Drill Stem Tests Database
Specific Well--15-101-21732
API: 15-101-21732
Operator: RHEEM RESOURCES
Field: Wildcat
Lease: SNIDER
Well 1
Location: T17S R29W, Sec. 9, NE SW
1980 North, 1980 East, from SW corner
Longitude: -100.5345611
Latitude: 38.5893444
County: Lane
Status: D&A
Spud Date: 03-NOV-96
Completion Date: 13-NOV-96
Plugging Date: 13-NOV-96
Total Depth: 4610
Form. at depth: MISSISSIPPIAN
Elevation: 2823 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4052 to 4064
Formation tested: Lansing KC ""E""
Date, Time: 07-NOV-96; 23:45:36
Initial Hydro Pressure: 1967 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 1091 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 53 PSI
Final Shut-in Pressure: 1066 PSI
Final Hydro Pressure: 1928 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4059 ft.
Initial Flow - Weak surface blow - died in 5 min. Initial Shut-in - No return
Final Flow - Bubble to open tool - no blow - weak surface blow in 10 min. - blew throughout
Final Shut-in - No return
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of muddy water 10 %mud 90% water
18000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4203 to 4220
Formation tested: J""
Date, Time: 08-NOV-96; 22:24:29
Initial Hydro Pressure: 2061 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 411 PSI
Second Initial Flow Pressure: 36 PSI
Second Final Flow Pressure: 56 PSI
Final Shut-in Pressure: 405 PSI
Final Hydro Pressure: 2038 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3648 ft.
Initial Flow - 1/8"" at open - built to 1/4 in. Initial Shut-in - No return
Final Flow - Bubble to open tool - weak surface blow in 23 min.
Final Shut-in - No return
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Pipe
80 of muddy water 60% water 40% mud
21000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4226 to 4245
Formation tested: K""
Date, Time: 09-NOV-96; 11:57:52
Initial Hydro Pressure: 2073 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 108 PSI
Initial Shut-in Pressure: 457 PSI
Second Initial Flow Pressure: 112 PSI
Second Final Flow Pressure: 183 PSI
Final Shut-in Pressure: 455 PSI
Final Hydro Pressure: 2040 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3648 ft.
Initial Flow - 1/8"" at open - built to 9"" Initial Shut-in - No return
Final Flow - Weak surface blow - built to 4""
Final Shut-in - No return
Bottom Hole Temperature: 129 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
360 of Total Fluid
360 of Fluid in Drill Pipe
60 of watery mud 35%water 65% mud trace oil
60 of slightly muddy water 80% water 20% mud
240 of water 100% water
24300 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4471 to 4525
Formation tested: lowwercherokee
Date, Time: 10-NOV-96; 19:49:50
Initial Hydro Pressure: 2278 PSI
First Initial Flow Pressure: 77 PSI
First Final Flow Pressure: 66 PSI
Initial Shut-in Pressure: 411 PSI
Second Initial Flow Pressure: 77 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 144 PSI
Final Hydro Pressure: 2255 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 3929 ft.
I.O.- weak surface blow died in 14 min. I.S.I.- no return F.F.- bubble to open tool no blow F.S.I.- no return
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Pipe
20 of drilling mud 100% mud Trace oil
View Pressures No Recovery Gas data.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4524 to 4556
Formation tested: Johnson
Date, Time: 11-NOV-96; 10:08:20
Initial Hydro Pressure: 2283 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 32 PSI
Initial Shut-in Pressure: 1037 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 52 PSI
Final Shut-in Pressure: 993 PSI
Final Hydro Pressure: 2223 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3960 ft.
Initial Flow - 1/8"" at open - built to 1-1/4"" - died back to 3/4"" Initial Shut-in - No return
Final Flow - Weak Surface blow - built to 1/4""
Final Shut-in - No return
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Pipe
30 of slightly gassy oil cut mud 5%g 5%o 90%m
60 of slightly oil cut mud 8%oil 92% mud
View Pressures No Recovery Gas data.