|
API: 15-101-21732
Operator: RHEEM RESOURCES Field: Wildcat Lease: SNIDER Well 1 |
Location: T17S R29W, Sec. 9, NE SW
1980 North, 1980 East, from SW corner Longitude: -100.5345611 Latitude: 38.5893444 County: Lane Status: D&A |
Spud Date: 03-NOV-96
Completion Date: 13-NOV-96 Plugging Date: 13-NOV-96 Total Depth: 4610 Form. at depth: MISSISSIPPIAN Elevation: 2823 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4052 to 4064
Formation tested: Lansing KC ""E"" | Date, Time: 07-NOV-96; 23:45:36 |
|
Initial Hydro Pressure: 1967 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: 1091 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 53 PSI Final Shut-in Pressure: 1066 PSI Final Hydro Pressure: 1928 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4059 ft. |
|
Initial Flow - Weak surface blow - died in 5 min. Initial Shut-in - No return Final Flow - Bubble to open tool - no blow - weak surface blow in 10 min. - blew throughout Final Shut-in - No return |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of muddy water 10 %mud 90% water 18000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4203 to 4220
Formation tested: J"" | Date, Time: 08-NOV-96; 22:24:29 |
|
Initial Hydro Pressure: 2061 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: 411 PSI Second Initial Flow Pressure: 36 PSI Second Final Flow Pressure: 56 PSI Final Shut-in Pressure: 405 PSI Final Hydro Pressure: 2038 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3648 ft. |
|
Initial Flow - 1/8"" at open - built to 1/4 in. Initial Shut-in - No return Final Flow - Bubble to open tool - weak surface blow in 23 min. Final Shut-in - No return |
|
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 80 of Total Fluid 80 of Fluid in Drill Pipe 80 of muddy water 60% water 40% mud 21000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4226 to 4245
Formation tested: K"" | Date, Time: 09-NOV-96; 11:57:52 |
|
Initial Hydro Pressure: 2073 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 108 PSI Initial Shut-in Pressure: 457 PSI Second Initial Flow Pressure: 112 PSI Second Final Flow Pressure: 183 PSI Final Shut-in Pressure: 455 PSI Final Hydro Pressure: 2040 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3648 ft. |
|
Initial Flow - 1/8"" at open - built to 9"" Initial Shut-in - No return Final Flow - Weak surface blow - built to 4"" Final Shut-in - No return |
|
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 360 of Total Fluid 360 of Fluid in Drill Pipe 60 of watery mud 35%water 65% mud trace oil 60 of slightly muddy water 80% water 20% mud 240 of water 100% water 24300 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4471 to 4525
Formation tested: lowwercherokee | Date, Time: 10-NOV-96; 19:49:50 |
|
Initial Hydro Pressure: 2278 PSI
First Initial Flow Pressure: 77 PSI First Final Flow Pressure: 66 PSI Initial Shut-in Pressure: 411 PSI Second Initial Flow Pressure: 77 PSI Second Final Flow Pressure: 66 PSI Final Shut-in Pressure: 144 PSI Final Hydro Pressure: 2255 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 3929 ft. |
| I.O.- weak surface blow died in 14 min. I.S.I.- no return F.F.- bubble to open tool no blow F.S.I.- no return | |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of drilling mud 100% mud Trace oil | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4524 to 4556
Formation tested: Johnson | Date, Time: 11-NOV-96; 10:08:20 |
|
Initial Hydro Pressure: 2283 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 1037 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 52 PSI Final Shut-in Pressure: 993 PSI Final Hydro Pressure: 2223 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3960 ft. |
|
Initial Flow - 1/8"" at open - built to 1-1/4"" - died back to 3/4"" Initial Shut-in - No return Final Flow - Weak Surface blow - built to 1/4"" Final Shut-in - No return |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Pipe 30 of slightly gassy oil cut mud 5%g 5%o 90%m 60 of slightly oil cut mud 8%oil 92% mud | |
| View Pressures | No Recovery Gas data. |