|
API: 15-101-21738
Operator: RHEEM RESOURCES Field: Buffalo Creek Lease: BOSLEY CHARLES Well 1 |
Location: T19S R28W, Sec. 3, NE NE NW
330 South, 2310 East, from NW corner Longitude: -100.4030655 Latitude: 38.4369862 County: Lane Status: D&A |
Spud Date: 09-APR-97
Completion Date: 18-APR-97 Plugging Date: 18-APR-97 Total Depth: 4650 Form. at depth: MISSISSIPPIAN Elevation: 2742 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4145 to 4170
Formation tested: 140 | Date, Time: 15-APR-97; 04:14:16 |
|
Initial Hydro Pressure: 2027 PSI
First Initial Flow Pressure: 10 PSI First Final Flow Pressure: 14 PSI Initial Shut-in Pressure: 967 PSI Second Initial Flow Pressure: 14 PSI Second Final Flow Pressure: 15 PSI Final Shut-in Pressure: 890 PSI Final Hydro Pressure: 2010 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.4 in. Drill Collar Length: ft. Drill Pipe Length: 4151 ft. |
|
Initial Flow: 1/4"" blow, died back to a weak 1/8"" Initial Shut In: No return Final Flow: Bubble to open tool, no blow Final Shut In: No return |
|
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 10 of Drilling Mud with Oil specs 100 % mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4285 to 4315
Formation tested: 220 | Date, Time: 16-APR-97; 01:48:27 |
|
Initial Hydro Pressure: 2110 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 979 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 29 PSI Final Shut-in Pressure: 828 PSI Final Hydro Pressure: 2056 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 3703 ft. |
|
Initial Flow: Weak surface blow, died in 28 mins Initial Shut In: No return Final Flow: Final Shut In: No return |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 10 of Drilling Mud with Oil specs 100% mud | |
| View Pressures | No Recovery Gas data. |