Drill Stem Tests Database
Specific Well--15-101-21738
API: 15-101-21738
Operator: RHEEM RESOURCES
Field: Buffalo Creek
Lease: BOSLEY CHARLES
Well 1
Location: T19S R28W, Sec. 3, NE NE NW
330 South, 2310 East, from NW corner
Longitude: -100.4030655
Latitude: 38.4369862
County: Lane
Status: D&A
Spud Date: 09-APR-97
Completion Date: 18-APR-97
Plugging Date: 18-APR-97
Total Depth: 4650
Form. at depth: MISSISSIPPIAN
Elevation: 2742 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4145 to 4170
Formation tested: 140
Date, Time: 15-APR-97; 04:14:16
Initial Hydro Pressure: 2027 PSI
First Initial Flow Pressure: 10 PSI
First Final Flow Pressure: 14 PSI
Initial Shut-in Pressure: 967 PSI
Second Initial Flow Pressure: 14 PSI
Second Final Flow Pressure: 15 PSI
Final Shut-in Pressure: 890 PSI
Final Hydro Pressure: 2010 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.4 in.
Drill Collar Length: ft.
Drill Pipe Length: 4151 ft.
Initial Flow: 1/4"" blow, died back to a weak 1/8"" Initial Shut In: No return
Final Flow: Bubble to open tool, no blow
Final Shut In: No return
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Pipe
10 of Drilling Mud with Oil specs 100 % mud
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4285 to 4315
Formation tested: 220
Date, Time: 16-APR-97; 01:48:27
Initial Hydro Pressure: 2110 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 979 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 29 PSI
Final Shut-in Pressure: 828 PSI
Final Hydro Pressure: 2056 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 3703 ft.
Initial Flow: Weak surface blow, died in 28 mins Initial Shut In: No return
Final Flow:
Final Shut In: No return
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Pipe
10 of Drilling Mud with Oil specs 100% mud
View Pressures No Recovery Gas data.