|
API: 15-101-21741
Operator: RHEEM RESOURCES Field: Pendennis Northwest Lease: GATES 'A' Well 1 |
Location: T16S R27W, Sec. 18, SE SW NW
2883 North, 3989 West, from SE corner Longitude: -100.3542974 Latitude: 38.6625672 County: Lane Status: OIL-P&A |
Spud Date: 04/18/1997
Completion Date: 05/30/1997 Plugging Date: 03/27/2003 Total Depth: 4560 Form. at depth: MISSISSIPPIAN Elevation: 2652 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3975 to 3994
Formation tested: Lansing KC ""E"" | Date, Time: 04/24/1997; 02:25:50 |
|
Initial Hydro Pressure: 1879 PSI
First Initial Flow Pressure: 561 PSI First Final Flow Pressure: 1075 PSI Initial Shut-in Pressure: 1098 PSI Second Initial Flow Pressure: 1082 PSI Second Final Flow Pressure: 1101 PSI Final Shut-in Pressure: 1103 PSI Final Hydro Pressure: 1866 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3968 ft. |
|
Initial Flow: Strong bottom of bucket in 30 sec Initial Shut-in: Bled off blow - no return Final Flow: Weak - steady 3"" blow Final Shut-in: No blow back |
|
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2355 of Total Fluid 2355 of Fluid in Drill Pipe 2355 of Water 50000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4055 to 4082
Formation tested: Lansing KC ""G-H"" | Date, Time: 04/24/1997; 18:01:26 |
|
Initial Hydro Pressure: 1957 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 981 PSI Second Initial Flow Pressure: 27 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 842 PSI Final Hydro Pressure: 1941 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4060 ft. |
|
Intial Flow: Weak steady surface blow Final Flow: No blow |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 10 of Slight Oil Cut Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4088 to 4151
Formation tested: Lansing KC ""I-J"" | Date, Time: 04/25/1997; 11:20:28 |
|
Initial Hydro Pressure: 2009 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 74 PSI Second Initial Flow Pressure: 21 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 42 PSI Final Hydro Pressure: 1964 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4093 ft. |
|
Initial Flow: Weak-Died in 15 min Final Flow: No blow |
|
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5 of Slight Oil Cut Mud w/ show free oil in tool | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4145 to 4170
Formation tested: Lansing KS ""K"" | Date, Time: 04/26/1997; 00:07:35 |
|
Initial Hydro Pressure: 2020 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 51 PSI Initial Shut-in Pressure: 770 PSI Second Initial Flow Pressure: 61 PSI Second Final Flow Pressure: 91 PSI Final Shut-in Pressure: 736 PSI Final Hydro Pressure: 1985 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4153 ft. |
|
Initial Flow: Weak building to strong 14"" blow Initial Shut-in: Bled off blow-no return Final Flow: Weak building to 8"" fair blow Final Shut-in: Bled off blow - weak surface blow throughout |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 134 of Total Fluid 134 of Fluid in Drill Pipe 10 of Clean Gassy Oil 62 of Gas & Oil Cut Mud 62 of Oil & Gas Cut Watery Mud 35%M 30000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4184 to 4211
Formation tested: Lansing KC ""L"" | Date, Time: 04/26/1997; 15:31:37 |
|
Initial Hydro Pressure: 2061 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 20 PSI Initial Shut-in Pressure: 58 PSI Second Initial Flow Pressure: 19 PSI Second Final Flow Pressure: 19 PSI Final Shut-in Pressure: 35 PSI Final Hydro Pressure: 2021 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4184 ft. |
|
Initial Flow: Weak -Died in 20 min Final Flow: No blow |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5 of Drilling mud | |
| View Pressures | No Recovery Gas data. |