|
API: 15-101-21743
Operator: Ranken Energy Corp. Field: Jennison Lease: Roberts Well 1-22 |
Location: T16S R29W, Sec. 22, SW SW NW
2967 North, 4729 West, from SE corner Longitude: -100.5211913 Latitude: 38.650233 County: Lane Status: OIL-P&A |
Spud Date: 08/23/1997
Completion Date: 09/11/1997 Plugging Date: 06/12/2019 Total Depth: 4660 Form. at depth: MISSISSIPPIAN Elevation: 2795 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4136 to 4159
Formation tested: Lans/KC ""J"" | Date, Time: 08/27/1997; 21:10:31 |
|
Initial Hydro Pressure: 2027 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 763 PSI Second Initial Flow Pressure: 26 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2015 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3167 ft. |
|
Initial Flow: Weak surface blow throughout Initial Shut In: No Blow Final Flow: No return - flushed tool/good surge no help. Pulled out of Hole at company orders |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 10 of Drilling Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4174 to 4213
Formation tested: Lans/KC | Date, Time: 08/28/1997; 12:55:22 |
|
Initial Hydro Pressure: 2059 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 51 PSI Initial Shut-in Pressure: 340 PSI Second Initial Flow Pressure: 67 PSI Second Final Flow Pressure: 110 PSI Final Shut-in Pressure: 289 PSI Final Hydro Pressure: 2042 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3601 ft. |
|
Initial Flow: Weak surface blow built to 11"" Initial Shut In: Bled off blow, surface return built to 1"" Final Flow: Weak Surface return built to bottom in 30 mins Final Shut In: Bled off blow, surface return built to 1"" |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 14 Samples: Gas Recovery: Comments: | |
|
Recovery 300 of Total Fluid 300 of Fluid in Drill Pipe 550 of Gas In Pipe 230 of Clean Gassy Oil 70 of Oil Cut Mud 35 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4207 to 4257
Formation tested: Lans/KC ""L"" | Date, Time: 08/29/1997; 06:01:02 |
|
Initial Hydro Pressure: 2096 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 86 PSI Initial Shut-in Pressure: 341 PSI Second Initial Flow Pressure: 94 PSI Second Final Flow Pressure: 170 PSI Final Shut-in Pressure: 318 PSI Final Hydro Pressure: 2020 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3631 ft. |
|
Initial Flow: Weak to fair blow built to 9"" Initial Shut In: Bled off blow - Surface return built to 1/2"" and died at 60 mins Final Flow: Weak to fair blow off bottom in 45 min Final Shut In: Bled off blow - surface return built to 1/2"" |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
|
Recovery 400 of Total Fluid 400 of Fluid in Drill Pipe 280 of Gas In Pipe 280 of Clean Gassy Oil - 10%gas 90%oil 60 of Gassy Slight Oil Cut Mud 60 of Gas Oil Water Cut Mud 31 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4396 to 4474
Formation tested: Marmaton Group | Date, Time: 08/30/1997; 12:13:21 |
|
Initial Hydro Pressure: 2213 PSI
First Initial Flow Pressure: 41 PSI First Final Flow Pressure: 137 PSI Initial Shut-in Pressure: 709 PSI Second Initial Flow Pressure: 183 PSI Second Final Flow Pressure: 261 PSI Final Shut-in Pressure: 747 PSI Final Hydro Pressure: 2188 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3880 ft. |
|
Initial Flow: Fair to strong blow off bottom in 4 mins. Initial Shut In: Bled off blow, fair blow off bottom in 10 mins Final Flow: Fair to strong blow off bottom in 4 mins Final Shut In: Bled off blow, fair blow built to bottom in 5 mins, Gas to Surface in 75 mins |
|
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 8 Samples: Gas Recovery: Comments: | |
|
Recovery 855 of Total Fluid 855 of Fluid in Drill Pipe 500 of Clean Gassy Oil 355 of Gassy Oil Cut Mud 34 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |