|
API: 15-101-21747
Operator: Ranken Energy Corp. Field: Jennison East Lease: Miller Well 1-21 |
Location: T16S R29W, Sec. 21, S2 NE SE
1650 North, 660 West, from SE corner Longitude: -100.5256957 Latitude: 38.6466918 County: Lane Status: D&A |
Spud Date: 28-SEP-97
Completion Date: 05-OCT-97 Plugging Date: 05-OCT-97 Total Depth: 4640 Form. at depth: MISSISSIPPIAN Elevation: 2808 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4193 to 4226
Formation tested: Lansing K | Date, Time: 02-OCT-97; 01:40:09 |
|
Initial Hydro Pressure: 2067 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 82 PSI Initial Shut-in Pressure: 227 PSI Second Initial Flow Pressure: 83 PSI Second Final Flow Pressure: 137 PSI Final Shut-in Pressure: 227 PSI Final Hydro Pressure: 2045 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4159 ft. |
|
Initial Flow- weak 1/2"" blow building to 7"" Initial Shutin- no blow Final Flow- no blow for 6 minutes then weak surface blow building to 3"" Final Shutin- no blow |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 270 of Total Fluid 30 of Fluid in Drill Collars 240 of Fluid in Drill Pipe 150 of Watery Mud With Oil Spots 120 of Muddy Water 60000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4374 to 4437
Formation tested: Altamont,Myrick,Pawn | Date, Time: 03-OCT-97; 04:56:10 |
|
Initial Hydro Pressure: 2205 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 985 PSI Second Initial Flow Pressure: 35 PSI Second Final Flow Pressure: 38 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2202 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4159 ft. |
|
Initial Flow- weak blow died in 25 minutes Initial Shutin- no blow Final Flow- no blow flush tool surge died in 2 minutes Final Shutin- no blow |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 15 of mud with oil scum in tool | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4273 to 4480
Formation tested: Lenapah-Lwr.Ft.Scott | Date, Time: 04-OCT-97; 20:13:12 |
|
Initial Hydro Pressure: 2188 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: 994 PSI Second Initial Flow Pressure: 52 PSI Second Final Flow Pressure: 54 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2137 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4229 ft. |
|
Initial Flow- weak 1"" blow decreasing to 3/4"" Initial Shutin- no blow Final Flow- weak surace blow died in 3 minutes Final Shutin- no blow |
|
|
Bottom Hole Temperature: 108 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 65 of Total Fluid 30 of Fluid in Drill Collars 35 of Fluid in Drill Pipe 65 of mud with oil scum at top | |
| View Pressures | No Recovery Gas data. |