Drill Stem Tests Database
Specific Well--15-101-21753
API: 15-101-21753
Operator: BRITO OIL COMPANY INC.
Field: Royalty West
Lease: HINEMAN FARMS
Well 1-8
Location: T19S R28W, Sec. 8, NE NE NE
330 South, 330 West, from NE corner
Longitude: -100.4304223
Latitude: 38.4226533
County: Lane
Status: D&A
Spud Date: 06-JAN-98
Completion Date: 15-JAN-98
Plugging Date: 15-JAN-98
Total Depth: 4700
Form. at depth: MISSISSIPPIAN
Elevation: 2767 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4203 to 4232
Formation tested: K/C ""I""
Date, Time: 12-JAN-98; 22:45:32
Initial Hydro Pressure: 2042 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 86 PSI
Initial Shut-in Pressure: 464 PSI
Second Initial Flow Pressure: 90 PSI
Second Final Flow Pressure: 177 PSI
Final Shut-in Pressure: 445 PSI
Final Hydro Pressure: 2027 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4199 ft.
IF; Surface blow built to 3"" ISI; No blow FF; Weak return steady throughout FSI; No blow
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
330 of Total Fluid
330 of Fluid in Drill Pipe
20 of WM w/Oil Scum @ Top 20%wtr 80%mud
310 of MW 95%wtr 5%mud
35000 of Salinity (PPM)
View Pressures No Recovery Gas data.