|
API: 15-101-21753
Operator: BRITO OIL COMPANY INC. Field: Royalty West Lease: HINEMAN FARMS Well 1-8 |
Location: T19S R28W, Sec. 8, NE NE NE
330 South, 330 West, from NE corner Longitude: -100.4304223 Latitude: 38.4226533 County: Lane Status: D&A |
Spud Date: 06-JAN-98
Completion Date: 15-JAN-98 Plugging Date: 15-JAN-98 Total Depth: 4700 Form. at depth: MISSISSIPPIAN Elevation: 2767 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4203 to 4232
Formation tested: K/C ""I"" | Date, Time: 12-JAN-98; 22:45:32 |
|
Initial Hydro Pressure: 2042 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 86 PSI Initial Shut-in Pressure: 464 PSI Second Initial Flow Pressure: 90 PSI Second Final Flow Pressure: 177 PSI Final Shut-in Pressure: 445 PSI Final Hydro Pressure: 2027 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4199 ft. |
| IF; Surface blow built to 3"" ISI; No blow FF; Weak return steady throughout FSI; No blow | |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 330 of Total Fluid 330 of Fluid in Drill Pipe 20 of WM w/Oil Scum @ Top 20%wtr 80%mud 310 of MW 95%wtr 5%mud 35000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |