Drill Stem Tests Database
Specific Well--15-101-21755
API: 15-101-21755
Operator: RHEEM RESOURCES
Field: Pendennis Southwest
Lease: ANDERSON TRUST
Well 1
Location: T16S R27W, Sec. 33, SW SW SE
330 North, 2167 West, from SE corner
Longitude: -100.3113916
Latitude: 38.6116534
County: Lane
Status: D&A
Spud Date: 02/27/1998
Completion Date: 03/09/1998
Plugging Date: 03/09/1998
Total Depth: 4570
Form. at depth: MISSISSIPPIAN
Elevation: 2647 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4140 to 4181
Formation tested: L KC 180'
Date, Time: 03/06/1998; 07:04:47
Initial Hydro Pressure: 2013 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 28 PSI
Initial Shut-in Pressure: 304 PSI
Second Initial Flow Pressure: 29 PSI
Second Final Flow Pressure: 31 PSI
Final Shut-in Pressure: 284 PSI
Final Hydro Pressure: 2011 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: ft.
Drill Pipe Length: 3260 ft.
I.O.- 1/2""in. @ open , died back to a I.S.I.- No return F.F.- Weak surface blow in 2 min. died F.S.I.- No return
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Pipe
15 of drilg mud w/oil spec's on top
1800 of Salinity (PPM)
View Pressures No Recovery Gas data.