Drill Stem Tests Database
Specific Well--15-101-21758
API: 15-101-21758
Operator: Dunne Oil Co.
Field: Wildcat
Lease: Suchy
Well 1-31
Location: T18S R27W, Sec. 31, SW NW SE
1870 North, 2245 West, from SE corner
Longitude: -100.3460715
Latitude: 38.4423288
County: Lane
Status: D&A
Spud Date: 01/17/1998
Completion Date: 01/27/1998
Plugging Date: 01/27/1998
Total Depth: 4650
Form. at depth: MISSISSIPPIAN
Elevation: 2730 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4269 to 4295
Formation tested: L/KC
Date, Time: 01/23/1998; 03:50:38
Initial Hydro Pressure: 2084 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 29 PSI
Initial Shut-in Pressure: 807 PSI
Second Initial Flow Pressure: 39 PSI
Second Final Flow Pressure: 111 PSI
Final Shut-in Pressure: 788 PSI
Final Hydro Pressure: 2058 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4258 ft.
IF; Weak to fair blow built to 10"" ISI; No return blow FF; Fair to strong blow off bttm in 7 mins. FSI; No return blow
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
210 of Total Fluid
210 of Fluid in Drill Pipe
90 of GOCM 10%gas 10%oil 80%mud
60 of GOWCM 55%gas 10%oil 15%water 20%mud
60 of Water
20000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4300 to 4314
Formation tested: Middle Creek
Date, Time: 01/23/1998; 19:35:42
Initial Hydro Pressure: 2095 PSI
First Initial Flow Pressure: 11 PSI
First Final Flow Pressure: 11 PSI
Initial Shut-in Pressure: 15 PSI
Second Initial Flow Pressure: 11 PSI
Second Final Flow Pressure: 14 PSI
Final Shut-in Pressure: 58 PSI
Final Hydro Pressure: 2081 PSI
Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4292 ft.
IF; Weak Surface blow built to 1/2"" FF; No return blow
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Pipe
1 of Drlg. Mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4298 to 4336
Formation tested: Lans/KC ""L""
Date, Time: 01/24/1998; 10:38:23
Initial Hydro Pressure: 2097 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 52 PSI
Initial Shut-in Pressure: 509 PSI
Second Initial Flow Pressure: 58 PSI
Second Final Flow Pressure: 234 PSI
Final Shut-in Pressure: 505 PSI
Final Hydro Pressure: 2077 PSI
Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4292 ft.
IF; Fair to strong blow built to 8"" ISI; Bled off blow - no return FF; Fair to strong return off bttm in 16 mins. FSI; Bled off blow - no return
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
460 of Total Fluid
460 of Fluid in Drill Pipe
100 of Watery Mud 40%wtr 60%mud
360 of Water 100%wtr
60000 of Salinity (PPM)
View Pressures No Recovery Gas data.