|
API: 15-101-21758
Operator: Dunne Oil Co. Field: Wildcat Lease: Suchy Well 1-31 |
Location: T18S R27W, Sec. 31, SW NW SE
1870 North, 2245 West, from SE corner Longitude: -100.3460715 Latitude: 38.4423288 County: Lane Status: D&A |
Spud Date: 01/17/1998
Completion Date: 01/27/1998 Plugging Date: 01/27/1998 Total Depth: 4650 Form. at depth: MISSISSIPPIAN Elevation: 2730 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4269 to 4295
Formation tested: L/KC | Date, Time: 01/23/1998; 03:50:38 |
|
Initial Hydro Pressure: 2084 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 807 PSI Second Initial Flow Pressure: 39 PSI Second Final Flow Pressure: 111 PSI Final Shut-in Pressure: 788 PSI Final Hydro Pressure: 2058 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4258 ft. |
| IF; Weak to fair blow built to 10"" ISI; No return blow FF; Fair to strong blow off bttm in 7 mins. FSI; No return blow | |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 210 of Total Fluid 210 of Fluid in Drill Pipe 90 of GOCM 10%gas 10%oil 80%mud 60 of GOWCM 55%gas 10%oil 15%water 20%mud 60 of Water 20000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4300 to 4314
Formation tested: Middle Creek | Date, Time: 01/23/1998; 19:35:42 |
|
Initial Hydro Pressure: 2095 PSI
First Initial Flow Pressure: 11 PSI First Final Flow Pressure: 11 PSI Initial Shut-in Pressure: 15 PSI Second Initial Flow Pressure: 11 PSI Second Final Flow Pressure: 14 PSI Final Shut-in Pressure: 58 PSI Final Hydro Pressure: 2081 PSI |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4292 ft. |
| IF; Weak Surface blow built to 1/2"" FF; No return blow | |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 1 of Total Fluid 1 of Fluid in Drill Pipe 1 of Drlg. Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4298 to 4336
Formation tested: Lans/KC ""L"" | Date, Time: 01/24/1998; 10:38:23 |
|
Initial Hydro Pressure: 2097 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: 509 PSI Second Initial Flow Pressure: 58 PSI Second Final Flow Pressure: 234 PSI Final Shut-in Pressure: 505 PSI Final Hydro Pressure: 2077 PSI |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4292 ft. |
| IF; Fair to strong blow built to 8"" ISI; Bled off blow - no return FF; Fair to strong return off bttm in 16 mins. FSI; Bled off blow - no return | |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 460 of Total Fluid 460 of Fluid in Drill Pipe 100 of Watery Mud 40%wtr 60%mud 360 of Water 100%wtr 60000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |