Drill Stem Tests Database
Specific Well--15-109-20626
API: 15-109-20626
Operator: Pelican Hill Oil and Gas, Inc.
Field: Elaine
Lease: Scheetz 'B'
Well 1
Location: T11S R34W, Sec. 35, SW SE NW
2200 South, 1650 East, from NW corner
Longitude: -101.066746
Latitude: 39.0553128
County: Logan
Status: D&A
Spud Date: 04/29/1996
Completion Date: 05/06/1996
Plugging Date: 05/06/1996
Total Depth: 4709
Form. at depth: MISSISSIPPIAN
Elevation: 3212 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4278 to 4340
Formation tested: K.C.-Lansing""H&I""
Date, Time: 05/03/1996; 15:25:28
Initial Hydro Pressure: 2031 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 121 PSI
Initial Shut-in Pressure: 1235 PSI
Second Initial Flow Pressure: 127 PSI
Second Final Flow Pressure: 238 PSI
Final Shut-in Pressure: 1227 PSI
Final Hydro Pressure: 2028 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: ft.
Drill Pipe Length: 3731 ft.
Initial Flow - Built steadily to 9.75"" in bucket
Initial Shutin - Bled off, no blow back
Final Flow - Built steadily to 11.5"" in bucket
Final Shutin - Bled off, no blow back
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
455 of Total Fluid
15 of Watery oil cut mud -
180 of Gassy water & oil cut mud -
260 of Slightly oil cut muddy water -
13000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4341 to 4390
Formation tested: K.C.-Lansing""J&K""
Date, Time: 05/04/1996; 09:00:35
Initial Hydro Pressure: 2044 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 30 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 44 PSI
Final Hydro Pressure: 2049 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: ft.
Drill Pipe Length: 3764 ft.
Initial Flow - Weak surface blow, died in 13.5 min
Initial Shutin - Blew back in 1 min, died 2 min later
Final Flow - Blow came back in 4 min, died 2.5 min
Final Shutin - No blow back
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Slightly oil cut mud - 4% oil, 96% mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4659 to 4709
Formation tested: Johnson
Date, Time: 05/05/1996; 14:10:02
Initial Hydro Pressure: 2311 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 49 PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2295 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: ft.
Drill Pipe Length: 4104 ft.
Initial Flow - Weak surface blow, died in 9 min
Initial Shutin - No blow back
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
3 of Total Fluid
3 of Mud w/ spots of oil
View Pressures No Recovery Gas data.