Drill Stem Tests Database
Specific Well--15-109-20627
API: 15-109-20627
Operator: PELICAN HILL O&G
Field: Wildcat
Lease: HESS
Well 1
Location: T13S R33W, Sec. 4, NW NW SE
2310 North, 2200 West, from SE corner
Longitude: -100.988654
Latitude: 38.9515188
County: Logan
Status: D&A
Spud Date: 12-MAY-96
Completion Date: 20-MAY-96
Plugging Date: 21-MAY-96
Total Depth: 4670
Form. at depth: MISSISSIPPIAN
Elevation: 3039 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3934 to 39650
Formation tested: TORONTO
Date, Time: 16-MAY-96; 19:47:16
Initial Hydro Pressure: 1822 PSI
First Initial Flow Pressure: 72 PSI
First Final Flow Pressure: 291 PSI
Initial Shut-in Pressure: 1100 PSI
Second Initial Flow Pressure: 415 PSI
Second Final Flow Pressure: 488 PSI
Final Shut-in Pressure: 1080 PSI
Final Hydro Pressure: 1802 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3392 ft.
IF; FAIR TO STRONG BLOW OFF BTTM IN 5 MINS. ISI; BLED OFF BLOW - WEAK SURFACE RETURN DIED IN 2 MINS. FF; WEAK TO FAIR BLOW OFF BTTM IN 7 MINS. FSI; BLED OFF BLOW - NO RETURN
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1085 of Total Fluid
548 of Fluid in Drill Pipe
1085 of Salt water w/ show of oil @ top
70000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3962 to 3980
Formation tested: LANS/KC ""A""
Date, Time: 17-MAY-96; 08:35:38
Initial Hydro Pressure: 1872 PSI
First Initial Flow Pressure: 384 PSI
First Final Flow Pressure: 1060 PSI
Initial Shut-in Pressure: 1200 PSI
Second Initial Flow Pressure: 1160 PSI
Second Final Flow Pressure: 1200 PSI
Final Shut-in Pressure: 1220 PSI
Final Hydro Pressure: 1832 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3424 ft.
IF; STRONG BLOW OFF BTTM IN 1 MIN. ISI; BLED OFF BLOW - NO RETURN FF; FAIR TO STRING BLOW OFF BTTM IN 2 MINS. FSI; BLED OFF BLOW - NO RETURN
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2575 of Total Fluid
2575 of Fluid in Drill Pipe
210 of MUDDY WATER 80%WATER 20%MUD
2362 of SALTY WATER
50000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3996 to 4070
Formation tested: LANS/KC B thru E
Date, Time: 18-MAY-96; 23:12:33
Initial Hydro Pressure: 1876 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 100 PSI
Initial Shut-in Pressure: 1192 PSI
Second Initial Flow Pressure: 105 PSI
Second Final Flow Pressure: 197 PSI
Final Shut-in Pressure: 1165 PSI
Final Hydro Pressure: 1851 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3453 ft.
Initial Flow - Surface blow, slowly built to 8""
Initial Shutin - No return blow
Final Flow - Weak return, slowly built to 4""
Final Shutin - No return blow
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
390 of Total Fluid
390 of Salt water w/ show of oil at top
30000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4123 to 4233
Formation tested: LANS/KC H thru K
Date, Time: 18-MAY-96; 18:53:17
Initial Hydro Pressure: 1926 PSI
First Initial Flow Pressure: 52 PSI
First Final Flow Pressure: 455 PSI
Initial Shut-in Pressure: 1166 PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1919 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3637 ft.
Initial Flow - Fair to strong blow off bottom in 3.5 min
Initial Shutin - Bled off blow, no return
Final Flow - Pulled tool at company orders
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
960 of Total Fluid
485 of Fluid in Drill Pipe
90 of Drilling mud w/ scum of oil -
870 of Salt water
30000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.