Drill Stem Tests Database
Specific Well--15-109-20634
API: 15-109-20634
Operator: NOR-WEST KANSAS OIL
Field: Logansport
Lease: L. A. HESS
Well 1
Location: T13S R33W, Sec. 4, SW SW NW
2930 North, 350 East, from SW corner
Longitude: -100.9983569
Latitude: 38.9532606
County: Logan
Status: D&A
Spud Date: 09-OCT-96
Completion Date: 17-OCT-96
Plugging Date: 17-OCT-96
Total Depth: 4680
Form. at depth: MISSISSIPPIAN
Elevation: 3049 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4174 to 4211
Formation tested: Lans/KC ""I""
Date, Time: 14-OCT-96; 12:28:54
Initial Hydro Pressure: 2069 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 95 PSI
Initial Shut-in Pressure: 1187 PSI
Second Initial Flow Pressure: 96 PSI
Second Final Flow Pressure: 161 PSI
Final Shut-in Pressure: 1148 PSI
Final Hydro Pressure: 2057 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4187 ft.
Initial Flow - Weak to fair blow off bottom in 43 mins. Initial Shut-in - Bled off blow - no return
Final Flow - Weak return - slowly built to 6"" blow
Final Shut-in - Bled off blow - no return
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
315 of Total Fluid
315 of Fluid in Drill Pipe
315 of Muddy Water 90%water 10%mud
55000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4538 to 579
Formation tested: Johnson
Date, Time: 16-OCT-96; 05:18:37
Initial Hydro Pressure: 2238 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 19 PSI
Initial Shut-in Pressure: 73 PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2220 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4523 ft.
Initial Flow - Weak surface blow - almost dead at 15 min.
Final Flow - No Flow period - pulled tool per Company orders.
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
3 of Total Fluid
3 of Fluid in Drill Pipe
3 of Drilling Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.