|
API: 15-109-20638
Operator: Pelican Hill Oil and Gas, Inc. Field: Wildcat Lease: Regan Well 1 |
Location: T11S R33W, Sec. 20, S2 N2 SW
1650 North, 1320 East, from SW corner Longitude: -101.0117517 Latitude: 39.0802181 County: Logan Status: D&A |
Spud Date: 14-JAN-97
Completion Date: 21-JAN-97 Plugging Date: 21-JAN-97 Total Depth: 4528 Form. at depth: JOHNSON ZONE Elevation: 3143 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4212 to 4245
Formation tested: Lansing KC | Date, Time: 19-JAN-97; 20:09:09 |
|
Initial Hydro Pressure: 2053 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 40 PSI Initial Shut-in Pressure: 1257 PSI Second Initial Flow Pressure: 42 PSI Second Final Flow Pressure: 43 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1996 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3674 ft. |
|
Initial Flow: Weak surfce blow, built to 1 3/4"" Initial Shut In: No return Final Flow: Bubble to open tool, No blow Final Shut In: Pull tool |
|
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Pipe 60 of Watery Mud 40% water 60% mud spec oil 40100 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4253 to 4328
Formation tested: Lansing KC - I,J,K | Date, Time: 20-JAN-97; 12:49:14 |
|
Initial Hydro Pressure: 2115 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: 1258 PSI Final Hydro Pressure: 2086 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 3733 ft. |
|
Initial Flow: Weak surface blow, built to Initial Shut In: Final Flow: Final Shut In: |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 40 of Drilling Mud 100%mud scum of oil | |
| View Pressures | No Recovery Gas data. |