Drill Stem Tests Database
Specific Well--15-109-20641
API: 15-109-20641
Operator: McCoy Petroleum Corp.
Field: Monument Northwest
Lease: Bertrand Trust 'A'
Well 1-11
Location: T11S R34W, Sec. 11, E2 SW NW
3300 North, 4290 West, from SE corner
Longitude: -101.0679537
Latitude: 39.1137418
County: Logan
Status: OIL-P&A
Spud Date: 03/04/1997
Completion Date: 03/26/1997
Plugging Date: 08/12/2010
Total Depth: 4800
Form. at depth: MISSISSIPPIAN
Elevation: 3201 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4330 to 4356
Formation tested: Lansing KC ""K""
Date, Time: 03/09/1997; 09:58:29
Initial Hydro Pressure: 2149 PSI
First Initial Flow Pressure: 161 PSI
First Final Flow Pressure: 555 PSI
Initial Shut-in Pressure: 1239 PSI
Second Initial Flow Pressure: 580 PSI
Second Final Flow Pressure: 944 PSI
Final Shut-in Pressure: 1227 PSI
Final Hydro Pressure: 2070 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: 253 ft.
Drill Pipe Length: 4070 ft.
Initial Flow: Bottom of bucket in .5 min Initial Shut In: Bled off blow for 9 min, return in 1 min, built to 5 ""
Final FLow: Bottom of bucket in .5 min
Final Shut In: Bled off blow for 5 min, weak return in 4 min of 1/8"", died in 20 min
Bottom Hole Temperature: 133 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2555 of Total Fluid
283 of Fluid in Drill Collars
2272 of Fluid in Drill Pipe
2460 of Clean Gassy Oil 10%gas 90% oil
95 of Slighty Muddy Gas Cut Oil
34 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4634 to 4687
Formation tested: Johnson
Date, Time: 03/11/1997; 15:27:45
Initial Hydro Pressure: 2331 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 194 PSI
Initial Shut-in Pressure: 995 PSI
Second Initial Flow Pressure: 202 PSI
Second Final Flow Pressure: 319 PSI
Final Shut-in Pressure: 981 PSI
Final Hydro Pressure: 2215 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 252 ft.
Drill Pipe Length: 4500 ft.
Initial Flow: Bottom of bucket in 13 mins Initial Shut In: No return
Final Flow: Weak surface blow, built to 6.5""
Final Shut In: No return
Bottom Hole Temperature: 135 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
700 of Total Fluid
176 of Fluid in Drill Collars
524 of Fluid in Drill Pipe
200 of Drilling Mud 100% mud
500 of Water 100% water
39000 of Salinity (PPM)
View Pressures No Recovery Gas data.