Drill Stem Tests Database
Specific Well--15-109-20660
API: 15-109-20660
Operator: Pelican Hill Oil and Gas, Inc.
Field: Hubert
Lease: Scheetz
Well 4
Location: T11S R33W, Sec. 22, SE SE SE
380 North, 380 West, from SE corner
Longitude: -100.9621831
Latitude: 39.0766674
County: Logan
Status: OIL
Spud Date: 04-NOV-97
Completion Date: 25-NOV-97
Plugging Date:
Total Depth: 4500
Form. at depth: MARMATON GROUP
Elevation: 3147 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4283 to 4303
Formation tested: Lansing J
Date, Time: 09-NOV-97; 17:03:49
Initial Hydro Pressure: 2084 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 53 PSI
Initial Shut-in Pressure: 1026 PSI
Second Initial Flow Pressure: 56 PSI
Second Final Flow Pressure: 128 PSI
Final Shut-in Pressure: 1029 PSI
Final Hydro Pressure: 2068 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3690 ft.
Initial Flow- weak 1"" blow building to bottom of bucket in 14 minutes Initial Shutin- 1/4"" blow throughout
Final Flow- weak 1"" blow building to bottom of bucket in 16 minutes
Final Shutin- surface blow building to 2 1/2""
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
295 of Total Fluid
295 of Fluid in Drill Pipe
958 of Gas in pipe
105 of Clean Gassy Oil 25% gas 75% oil
60 of Gassy Slightly Watery Mud Cut Oil
60 of Gassy Oil & Water Cut Mud
70 of Muddy Water 85% water 15% mud Rw.19@61
46000 of Salinity (PPM)
39 of Gravity (API)
View Pressures No Recovery Gas data.