Drill Stem Tests Database
Specific Well--15-119-20971
API: 15-119-20971
Operator: Cross Bar Petroleum, Inc.
Field: Plains
Lease: Roehr
Well 1-17
Location: T32S R30W, Sec. 17, SW
1320 North, 1320 East, from SW corner
Longitude: -100.6120029
Latitude: 37.2606221
County: Meade
Status: D&A
Spud Date: 04-NOV-96
Completion Date: 17-NOV-96
Plugging Date: 17-NOV-96
Total Depth: 5800
Form. at depth: CHESTER
Elevation: 2774 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5581 to 5624
Formation tested:
Date, Time: 13-NOV-96; 23:47:19
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5610 to 5634
Formation tested: Morrow
Date, Time: 14-NOV-96; 19:19:31
Initial Hydro Pressure: 2732 PSI
First Initial Flow Pressure: 42 PSI
First Final Flow Pressure: 124 PSI
Initial Shut-in Pressure: 1424 PSI
Second Initial Flow Pressure: 38 PSI
Second Final Flow Pressure: 185 PSI
Final Shut-in Pressure: 1419 PSI
Final Hydro Pressure: 2603 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5305 ft.
Initial Flow - Strong blow - bottom of bucket in 2 min. Initial Shut-in - Bled off 2"" - no blow back
Final Flow - Fair blow - built to bottom of bucket in 16 min.
Final Shut-in - Bled off 2"" - no blow back
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
330 of Total Fluid
330 of Fluid in Drill Pipe
1710 of Gas in Pipe
30 of Slight oil gas with 8%Gas 2%Oil 30%Water
120 of Oil & Gas cut 20%Gas 5%Oil 50%Water
180 of Slightly mud cut 90%Water 10%Mud
92000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5592 to 5620
Formation tested: Morrow
Date, Time: 16-NOV-96; 12:52:16
Initial Hydro Pressure: 2759 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 92 PSI
Initial Shut-in Pressure: 1359 PSI
Second Initial Flow Pressure: 91 PSI
Second Final Flow Pressure: 140 PSI
Final Shut-in Pressure: 1360 PSI
Final Hydro Pressure: 2605 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5754 ft.
Initial Flow - Strong blow - bottom of bucket in 7 min. Initial Shut-in - Bled off 2"" - no blow back
Final Flow - Strong blow - bottom of bucket in 4 min.
Final Shut-in - Bled off 2"" - no blow back
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
270 of Total Fluid
270 of Fluid in Drill Pipe
4230 of Gas in drilling pipe
30 of watery mud film oil 15%water 85%mud
120 of Slight gas with 15%Gas 25%Water 60%Mud
120 of Slight gas with watery mud 5%Gas 70%Water
63000 of Salinity (PPM)
View Pressures No Recovery Gas data.