|
API: 15-119-20971
Operator: Cross Bar Petroleum, Inc. Field: Plains Lease: Roehr Well 1-17 |
Location: T32S R30W, Sec. 17, SW
1320 North, 1320 East, from SW corner Longitude: -100.6120029 Latitude: 37.2606221 County: Meade Status: D&A |
Spud Date: 04-NOV-96
Completion Date: 17-NOV-96 Plugging Date: 17-NOV-96 Total Depth: 5800 Form. at depth: CHESTER Elevation: 2774 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5581 to 5624
Formation tested: | Date, Time: 13-NOV-96; 23:47:19 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5610 to 5634
Formation tested: Morrow | Date, Time: 14-NOV-96; 19:19:31 |
|
Initial Hydro Pressure: 2732 PSI
First Initial Flow Pressure: 42 PSI First Final Flow Pressure: 124 PSI Initial Shut-in Pressure: 1424 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 185 PSI Final Shut-in Pressure: 1419 PSI Final Hydro Pressure: 2603 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5305 ft. |
|
Initial Flow - Strong blow - bottom of bucket in 2 min. Initial Shut-in - Bled off 2"" - no blow back Final Flow - Fair blow - built to bottom of bucket in 16 min. Final Shut-in - Bled off 2"" - no blow back |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 330 of Total Fluid 330 of Fluid in Drill Pipe 1710 of Gas in Pipe 30 of Slight oil gas with 8%Gas 2%Oil 30%Water 120 of Oil & Gas cut 20%Gas 5%Oil 50%Water 180 of Slightly mud cut 90%Water 10%Mud 92000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5592 to 5620
Formation tested: Morrow | Date, Time: 16-NOV-96; 12:52:16 |
|
Initial Hydro Pressure: 2759 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 92 PSI Initial Shut-in Pressure: 1359 PSI Second Initial Flow Pressure: 91 PSI Second Final Flow Pressure: 140 PSI Final Shut-in Pressure: 1360 PSI Final Hydro Pressure: 2605 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5754 ft. |
|
Initial Flow - Strong blow - bottom of bucket in 7 min. Initial Shut-in - Bled off 2"" - no blow back Final Flow - Strong blow - bottom of bucket in 4 min. Final Shut-in - Bled off 2"" - no blow back |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
|
Recovery 270 of Total Fluid 270 of Fluid in Drill Pipe 4230 of Gas in drilling pipe 30 of watery mud film oil 15%water 85%mud 120 of Slight gas with 15%Gas 25%Water 60%Mud 120 of Slight gas with watery mud 5%Gas 70%Water 63000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |