API: 15-119-20977
Operator: CROSS BAR PETROLEUM, INC. Field: Wildcat Lease: Loewen Well 1-16 |
Location: T33S R27W, Sec. 16, NW NW
660 South, 460 East, from NW corner Longitude: -100.2700427 Latitude: 37.1820332 County: Meade Status: D&A |
Spud Date: 24-FEB-97
Completion Date: 09-MAR-97 Plugging Date: 09-MAR-97 Total Depth: 5850 Form. at depth: CHESTER Elevation: 2450 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5747 to 5800
Formation tested: Chester | Date, Time: 07-MAR-97; 00:39:25 |
Initial Hydro Pressure: 2753 PSI
First Initial Flow Pressure: 34 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 159 PSI Second Initial Flow Pressure: 32 PSI Second Final Flow Pressure: 33 PSI Final Shut-in Pressure: 590 PSI Final Hydro Pressure: 2725 PSI |
Tool Data Hole Size: 6.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 523 ft. Drill Pipe Length: 5215 ft. |
Initial Flow - Weak blow through out Final Flow - Weak blow - built to 1 1/2"" |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of Drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5674 to 5749
Formation tested: Morrow | Date, Time: 06-MAR-97; 00:18:47 |
Initial Hydro Pressure: 2723 PSI
First Initial Flow Pressure: 66 PSI First Final Flow Pressure: 75 PSI Initial Shut-in Pressure: 520 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 61 PSI Final Shut-in Pressure: 192 PSI Final Hydro Pressure: 2651 PSI |
Tool Data Hole Size: 6.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 523 ft. Drill Pipe Length: 5154 ft. |
Initial Flow - Strong Blow Bottom of bucket in 1 minute Gas to surface in 10 minutes Final Flow - Strong blow, Bottom of bucket in 1 minute Final Shut-in - Bled off blow, weak blow built to 7 inches. |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Yes Gas Recovery: Comments: | |
Recovery 90 of Total Fluid 90 of Fluid in Drill Collars 90 of Drilling mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |